Similar Projects
Hickory Grove Mixed Use
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Hanover, VA 23069

Construct a Private Water Well
Infrastructure
Bidding
$40,000 CJ est. value
Ashland, VA 23005

Jackson Avenue Water Storage Tank Demolition
Demolition, Infrastructure
Bidding
$12,000 CJ est. value
Mechanicsville, VA 23111

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Latex Modified
Results
$3,534,000 est. value

Dominion Lock & Key Warehouse
New Construction, Renovation - 15,000 SF
Pending Verification
Mechanicsville, VA

Well Installation and Well Abandonment
Infrastructure
Bidding
$200,000 CJ est. value
Mechanicsville, VA 23116

On-Call Trench Widening
Infrastructure
Post-Bid
$3,500,000 est. value
Ashland, VA

2021 Plant Mix
Results
$3,111,000 est. value

Elementary School Construction
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Ashland, VA 23005

Well Installation and Well Abandonment
Infrastructure
Post-Bid
$320,000 CJ est. value
Highland Springs, VA 23075

Richmond South BIMS
Term Contract
Results

I95 Corridor Substructure Rehab
Infrastructure
Bidding
$2,978,000 CJ est. value
Ashland, VA 23005

Last Updated 09/02/2022 02:11 PM
Project Title

Amazon Fulfillment Center - Project Rocky / Rockville

Physical Address View project details and contacts
City, State (County) Rockville, VA 23146   (Hanover County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The facility is expected to have 55 loading docks, 414 truck trailer parking spaces and approximately 1,700 parking spaces for employees. As of September 2, 2022, this project is pending rezoning approvals and a conditional use permit. A firm construction schedule has not been determined.

Details

5 Stories Above Grade, 650,000 SF, 70.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.