Similar Projects
West Fork Channel Rehabilitation - City of Cincinnati
Infrastructure
Conception
$1,000,000 CJ est. value
Cincinnati, OH 45202

Bolton Plant Well #4 Replacement - City of Cincinnati
Infrastructure
Conception
$1,500,000 CJ est. value
Cincinnati, OH 45207

The RED - Commercial Building
New Construction, Infrastructure - 50,000 SF
Design
$15,000,000 CJ est. value
Cincinnati, OH 45227

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

RFQ Contractor - EHRM Infrastructure Upgrades Cincinnati Project
Term Contract, New Construction, Renovation, Infrastructure
Bidding
$50,000,000 CJ est. value
Cincinnati, OH 45220

RFP - Redevelopment of the Town Center Site
New Construction, Infrastructure - 147,000 SF
Bidding
$8,875,000 CJ est. value
Cincinnati, OH 45214

Redevelopment of 31 Garfield Place
Infrastructure
Post-Bid
Cincinnati, OH 45202

Kenwood Triangle Disposition and Development
Infrastructure
Post-Bid
Blue Ash, OH 45242

Demolition and Site Restoration of 1400 Harrison Avenue Building 2
Demolition, Infrastructure - 9,000 SF
Results
Cincinnati, OH 45214

Phase 3C BP1 Garage Foundations and Site Preparation
New Construction, Infrastructure
Results
$2,079,352 est. value
Cincinnati, OH 45202

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Artisan Village
New Construction, Infrastructure - 440,000 SF
Pending Verification
$1,300,000,000 CJ est. value
Cincinnati, OH 45246

Aquatics Facilities Renovation - City of Cincinnati
Renovation, Infrastructure
Conception
$411,000 CJ est. value
Cincinnati, OH 45202

Last Updated 12/20/2022 04:04 AM
Project Title

Westport Village Pump Station Elimination

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45202   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,495,292 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will install a gravity sewer for the purpose of eliminating an existing pump station and associated force main. This project includes construction of approximately 1,095 linear feet of 12- inch diameter gravity sanitary sewer, and eight (8) new manholes. The work is located in the Mill Creek West Basin of the Central Basin in Green Township, Hamilton County, Ohio. If a contract is awarded, it will be done so in accordance with the Contract Documents, including the method of award identified in Section H of the Instructions to Bidders in Section 00 21 13. The City reserves the right to reject any or all bids, to waive technicalities, or to advertise for new bids, if the best interests of the City will be promoted thereby. Bids must be submitted in accordance with the Contract Documents and must be accompanied by the Bid Guaranty and Contract Bond, certified check, or letter of credit drawn on a solvent bank in an amount not less than ten percent (10%) of the bid amount, and in no event shall be less than five hundred dollars ($500.00). Bidder shall also submit a completed Addenda Acknowledgment Form with the bid. In addition to other documents, after the Bid Opening and upon notification, the apparent lowest and best bidder will need to obtain proof of Workers Compensation coverage and a certificate of insurance within ten (10) business days, naming the City as the primary insured and the Hamilton County, Ohio Board of County Commissioners as an additional insured. See the Contract Documents, including but not limited to the Modified General Conditions, for further certificate of insurance requirements and limits of liability. No bidder may withdraw its bid within sixty (60) days after the bid opening. Bids and award of contract may be held by the City for a period not to exceed sixty (60) days from the date of bid opening, for the purpose of reviewing the bids and investigating the qualifications of the Bidder in accordance with the Contract Documents. This project will utilize Water Pollution Control Loan Fund (WPCLF) funding. As such, as a condition of receiving capitalization grants from U.S. EPA for the WPCLF and the Water Supply Revolving Loan Account (WSRLA), the Ohio EPA negotiates fair share Disadvantaged Business Enterprises (DBE) objectives with U.S. EPA. The current negotiated goals for construction related activities are 1.3% of all contracts to MBEs and 1.0% of all contracts to WBEs. Bidders are cautioned to read, understand, and complete the WPCLF forms in their entirety. Failure to do so may render the bid non-responsive. The City shall neither accept nor be liable for any increase in costs, or other expenses, delay, loss, or subsequent ineligibility to contract with the City, incurred by a contractor as a result of the City rejecting any proposed person, firm, partner, principal, affiliate, subcontractor or supplier that is debarred or suspended after the submission of a bid, proposal, or other communication leading to a contract, but before the approval or award of the contract. All bidders will also be subject to the provisions of the Contract Compliance Program regarding equal employment opportunity and to the projects applicable labor wage rate. Question Deadline 11/17/2022 at 12:00 PM ET Questions on this project or any part of the Contract Documents and other project documents must be sent via e-mail to MSD.PROCUREMENT@cincinnati-oh.gov by the established deadline.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents