Similar Projects
Water Treatment Plant High Lift Pump No. 5 Replacement and Electrical Improvements
Infrastructure, Alteration
Bidding
Bismarck, ND 58504

Plugging Wells
Term Contract
Post-Bid

Plugging Wells
Term Contract
Post-Bid

RRVWSP - MRIPS Wet Well and Site Development
Results
$3,000,000 to $4,000,000 est. value
Carrington, ND

Reclaim 11 Wells - East
Infrastructure
Results
ND

Well Equipment Removal Package 1
Demolition
Post-Bid

Reclaim 10 Wells -West
Infrastructure
Results
ND

Well Equipment Removal Package 2
Demolition
Post-Bid

Reclamation of Wells - Package 1
Infrastructure
Results
Bismarck, ND

Well Equipment Removal Package 3
Alteration
Post-Bid
Bismarck, ND

Reclamation of Wells - Package 2
Infrastructure
Results
Bismarck, ND

Reclamation of Wells - Package 3
Infrastructure
Results
Bismarck, ND

Reclamation of Wells - Package 4
Infrastructure
Results
Bismarck, ND

Last Updated 10/12/2021 11:39 AM
Project Title

Reclamation of Wells - Package 5

Physical Address View project details and contacts
City, State (County) Bismarck, ND   (Burleigh County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) contact landowner and go over the reclaim plan. 2) Remove surfacing material from site. 3) Remove contamination down to 4’ or to levels of 10,000 ppm with no free product for TPH and Electrical conductivity (EC) of 2000 micro siemens/cm. 4) Recontour the site, rip the site to alleviate compaction, and spread 6 inches of topsoil. 6) Seed with native grass or seed specified by landowner (if tillable no seeding will be needed). Below is the list of sites: 1547 – P.M. King 2 – NENE Section 23-T162N-R80W 3512 – ROGER KERSTEN ESTATE 1 – SESE Section 4-T160N-R79W 4093 – Ter Haar #1 - Sene Section 21-T163N-R82W 6285 – Harold Gravseth 1 – SWSE Section 31-T164N-R78W 7064 – Watland 1 – Sene Section 23-T163N-R82W 9108 – Kjelshus 9-11 – NESW Section 9-T163N-R78W 9839 – Bronderslev 2 – NESW Section 32-T162N-81W 10462 – NWMU GB-2R – SWNE Section 35-T164N-R80W 10907 – Pearson 31-30 – NWNE Section 30-T163N-R82W 20673 – NWMU A-11H – SENW Section 36-T164N-R80W 20681 – NWMU A-10H – SESE Section 36-T164N-R80W

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents