Similar Projects
Magnolia Flats
New Construction, Build-Out - 85,900 SF
Conception
Less than $500,000 CJ est. value
Riverside, CA 92506

New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

Dinah Shore Drive Multi-Residential And Self Storage Facility
New Construction
Design
$55,000,000 est. value
Rancho Mirage, CA 92270

Landscape Renovation, Perris / Menifee Desalter I Facility
Infrastructure
Design
$200,000 CJ est. value
Perris, CA 92571

O'Reilly Auto Parts / Calimesa
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Calimesa, CA 92320

Pavement Rehabilitation For Various Local Streets
Infrastructure
Bidding
$2,444,260 CJ est. value
Moreno Valley, CA 92557

I-15 and SR 76, 78, 79, and 371 Middle-Mile Broadband Network
Infrastructure
Sub-Bidding
$75,000,000 CJ est. value
Riverside, CA 92522

Chiller Replacement at Hemet High School
Renovation
Sub-Bidding
$389,000 CJ est. value
Hemet, CA 92544

AutoZone #5327 / Murrieta
New Construction, Infrastructure - 6,500 SF
Post-Bid
$1,500,000 CJ est. value
Murrieta, CA 92563

March Mountain HS Cosmetology CTE
Renovation
Post-Bid
Moreno Valley, CA 92553

Enchanted Hills Elementary Portable Classroom Improvements
Renovation
Results
Perris, CA 92570

District-Wide Modular Classrooms
New Construction
Results
Menifee, CA 92586

Extra Space Storage
New Construction - 26,721 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
La Quinta, CA 92253

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Pending Verification
$170,000,000 CJ est. value
Wildomar, CA 92595

Last Updated 08/22/2022 05:32 AM
Project Title

Pre-construction and Lease-leaseback Services for TK-8 School Site - Phase 2

Physical Address View project details and contacts
City, State (County) Temecula, CA 92590   (Riverside County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 29, 2022, project was awarded to Bernards Bros Inc but awarded amount is not available.** The District is seeking Proposals ("RFP") No. 2020-21-505 from qualified persons, firms, partnerships, or corporations for pre-construction services and lease-leaseback construction services for Phase 2 - TK-8 School Site. Turn key project consisting of: one 15,080 square foot site built classroom building one 9,168 square foot pre-engineered metal framed classroom building one 3,337 square foot pre-engineered metal framed media center building 7,500 square foot site built addition to an existing multipurpose building placement and refurbishment of 1,920 square foot portable classroom building additional exterior and interior components, infrastructure, including playgrounds shade structures and various hard and softscape improvements Prequalification in compliance with Public Contract Code section 20111.6 is required for this Project. May 24, 2022 Deadline for Submittal of Questions by 3:00 pm June 28, 2022 Anticipated Board Date

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Door Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents