Similar Projects
Last Updated | 06/04/2023 05:01 PM |
Project Title | 2023 Road Improvement Projects |
Physical Address | View project details and contacts |
City, State (County) | Louisville, TN 37777 (Blount County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of: Project A - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Holston College Road. Total overlay area = ap- proximately 15,254 s.y.; shoulder stone = approximately 15,254 linear ft.; shoulder maintenance = approximately 15,254 linear feet; pavement striping = approximately 7,627 linear feet. Project B - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Dug Gap Road. Total overlay area = approximately 15,840 s.y.; shoulder stone = approximately 15,840 linear ft.; shoul- der maintenance = approximately 15,840 linear feet; pavement striping = approximately 7,920 linear feet. All questions about the meaning or intent of the Contract Documents are to be directed to: Mayor P.O. Box 215 Louisville, TN 37777 Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda, mailed or delivered to all parties recorded as having properly requested and received the Bidding Documents. 5.2. Questions received less than six days prior to the bid opening date may not be answered. 5.3. Only questions answered by formal addendum shall be binding. Oral or other interpretations or clarifications will be considered without legal effect. 5.4. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Town The work described in these specifications consists of furnishing all labor, materials, tools, equipment and services and performing all work in accordance with these specifications for the following projects. 1.1.1. Project A - Shoulder stone, shoulder maintenance and asphalt overlay on Holston College Road. Refer to Bid Form D-1 for quantities and locations. 1.1.2. Project B - Shoulder stone, shoulder maintenance and asphalt overlay on Dug Gap Road. Refer to Bid Form D-1 for quantities and locations. 1.1.3. Project C - 2" Level/Compacted Stone with 2" Topping. Louisville Town Hall walking trail/playground parking lot. 1.1.4. Project D - Rumble Strips Old Lowes Ferry and Little Dug Gap Roads |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |