Similar Projects
Clayton Lodge Kitchen Expansion
Addition, Demolition, Infrastructure
Design
$500,000 CJ est. value
Maryville, TN 37804

Photovoltaic Array
Infrastructure
Design
$10,000,000 CJ est. value
Louisville, TN 37777

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Great Smoky Mountains - Road Repair and Site Work
Infrastructure
Post-Bid
$2,000,000 to $10,000,000 est. value
Tallassee, TN

Great Smoky Mountains National Park
Alteration
Results
$10,000,000 est. value
TN

Resurfacing on u.s. 321 (S.R. 73) From North of West Millers Cove Road (L.M. 22.90) to South of Old Tuckaleechee Road (L.M. 26.65).
Infrastructure
Results
TN

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

Stone Creek Office and Warehouse
New Construction, Infrastructure - 17,099 SF
Pending Verification
$2,000,000 CJ est. value
Maryville, TN 37803

Northfield Drive Stormwater Pipe Replacement Project
Infrastructure
Post-Bid
$295,000 CJ est. value
Maryville, TN 37804

Ground Base PV Array
New Construction, Infrastructure
Results
$4,879,004 CJ est. value
Louisville, TN 37777

Pellissippi Place Mixed-Use
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Alcoa, TN 37804

Cusick Street Sidewalk Improvements
Infrastructure
Post-Bid
Maryville, TN 37804

North End Booster Pump Stations
New Construction, Infrastructure
Results
$1,027,963 CJ est. value
Lenoir City, TN 37772

Blount County Cancer Center / Alcoa
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Alcoa, TN 37701

Last Updated 06/04/2023 05:01 PM
Project Title

2023 Road Improvement Projects

Physical Address View project details and contacts
City, State (County) Louisville, TN 37777   (Blount County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of: Project A - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Holston College Road. Total overlay area = ap- proximately 15,254 s.y.; shoulder stone = approximately 15,254 linear ft.; shoulder maintenance = approximately 15,254 linear feet; pavement striping = approximately 7,627 linear feet. Project B - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Dug Gap Road. Total overlay area = approximately 15,840 s.y.; shoulder stone = approximately 15,840 linear ft.; shoul- der maintenance = approximately 15,840 linear feet; pavement striping = approximately 7,920 linear feet. All questions about the meaning or intent of the Contract Documents are to be directed to: Mayor P.O. Box 215 Louisville, TN 37777 Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda, mailed or delivered to all parties recorded as having properly requested and received the Bidding Documents. 5.2. Questions received less than six days prior to the bid opening date may not be answered. 5.3. Only questions answered by formal addendum shall be binding. Oral or other interpretations or clarifications will be considered without legal effect. 5.4. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Town The work described in these specifications consists of furnishing all labor, materials, tools, equipment and services and performing all work in accordance with these specifications for the following projects. 1.1.1. Project A - Shoulder stone, shoulder maintenance and asphalt overlay on Holston College Road. Refer to Bid Form D-1 for quantities and locations. 1.1.2. Project B - Shoulder stone, shoulder maintenance and asphalt overlay on Dug Gap Road. Refer to Bid Form D-1 for quantities and locations. 1.1.3. Project C - 2" Level/Compacted Stone with 2" Topping. Louisville Town Hall walking trail/playground parking lot. 1.1.4. Project D - Rumble Strips Old Lowes Ferry and Little Dug Gap Roads

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents