Similar Projects
HVAC Replacement
Alteration
Bidding
$1,200,000 est. value
Sulphur, OK 73086

HVAC Services
Post-Bid
Lawton, OK 73501

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

Cleaning of HVAC System SPRO
Results
Anadarko, OK 73001

Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)
Results
Oklahoma City, OK 73104

H141--HVAC systems Software Building Main
Term Contract
Post-Bid
Muskogee, OK

Z2da--(Con) 635 - Oklahoma City Vamc Replace Lawton Outpatient Clinic Air Cool Chiller (Va-21-00046407)
Results
$250,000 to $500,000 est. value
Fort Sill, Oklahoma City, OK 73503

Annex Building HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73117

HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

Will Rogers Elementary HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73142

Guthrie GUES and JR High Gym HVAC Renovation
Results
Guthrie, OK

S21-041 H53 Systems Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

J041--Chiller #2, #3, & #4, Repair Oklahoma City VA Health Care System Oklahoma City, OK 73104
Term Contract
Results
Oklahoma City, OK 73104

Cath Lab HVAC Replacement
Alteration
Post-Bid
Tulsa, OK 74127

Central Middle School - 2021 HVAC Renovation
Alteration
Results
Edmond, OK 73034

Last Updated 12/28/2021 05:05 PM
Project Title

HVAC Improvements at Grissom Elementary School

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74133   (Tulsa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Included: Provide HVAC and exhaust systems installation and modifications as outlined herein and as needed for a complete and proper installation including, but not necessarily limited to: 1. Furnish and install gas heat/electric cooling roof top units with curbs. Provide systems complete with insulated supply and return ductwork, air devices, balance dampers, fire dampers, smoke dampers, smoke detectors, interlocks, vibration isolation, air filters, and additional items required for a complete and fully functional system. 2. Provide refrigerant mini-split system with fan coil units, heat pumps or cooling only condensing units, refrigerant piping, supply and return ductwork, air devices, system controls, throwaway air filters, and all accessories required for a complete and fully functional system for areas identified on the drawings. 3. Building design shall include building pressure balance system to provide building pressure relief but still maintain building at slightly positive pressure. 4. Provide thermal and acoustical insulation for supply, return, and outside air duct systems. Ductwork shall be wrapped, except immediately at the unit for a minimum of 10ft. from the unit where the duct shall be lined with acoustical 3 pound density, 2 inch thick liner. 5. All air systems shall be balanced to the designed air flows by a NEBB certified contractor. Balance procedures and reporting shall be per NEBB Standard methods and procedures. 6. Provide building heating and cooling load calculations for determination of equipment sizes to be installed in each area to the owner for review and approval, prior to ordering equipment. 7. Mechanical contractor to furnish and install a “Supco” low pressure switch #SLP 0530 and a “Supco” SF 9602 ¼”MPT x ¼”MPT x ¼”FPT brass tee installed on high pressure side of all new and existing DX systems, RTU, and split systems. Wiring to alarm system by alarm contractor. 8. Demolition: • Disconnect, remove, and prepare existing systems for completion of the Scope of Work of this section as shown on the drawings and as affected by other sections noted herein. • If pipe, insulation, or equipment to remain is damaged or disturbed, remove damaged portions and make repairs. • Work abandoned in place: Cut and remove back to system main. Cap piping and patch surface to match final finish. Permanently mark all work abandoned in place and not operation. • Removal: Remove equipment and materials from the Project site to approved location daily. • Required disconnection or interruption of existing building systems shall be coordinated with the Owner prior to performing Work. All buildings users and departments affected by the interruption shall be notified as directed by the Owner within the time frame required by the Owner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents