Similar Projects
Carrier Services Group
Renovation
Conception
Port Crane, NY 13833

United Auto Supply Warehouse / Distribution Center
New Construction - 80,000 SF
Conception
$7,592,000 est. value
Syracuse, NY 13203

Self Storage Facility & Apartments
Renovation, Addition - 26,000 SF
Design
Tarrytown, NY 10591

Self-Storage Facility
New Construction
Design
Schenectady, NY 12305

Matrix Distribution Warehouse Facility
New Construction - 241,800 SF
Post-Bid
Middletown, NY 10940

UPS Mezzanine Demolition
Demolition - 10,000 SF
Post-Bid
Yonkers, NY 10710

Phase 2 - Capital Project Phase 2 High School, Park Avenue, Bus Garage and Bus Storage Barn
Results
Warwick, NY

Salt Storage Shed
Results
Lewis, NY

Port of Albany Maritime Warehouse and Related Maritime Terminal Improvements
New Construction, Demolition - 60,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albany, NY 12202

Safeguard Self Storage
New Construction - 60,052 SF
Construction
$12,000,000 est. value
Larchmont, NY 10538

Weibel Avenue Mixed Use
New Construction
Pending Verification
Saratoga Springs, NY 12866

Warehouses
New Construction - 100,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Glenville, NY 12302

Central New York Inland Port
New Construction
Conception
East Syracuse, Manlius, NY 13057

Intergrow East Greenhouses
New Construction - 124,312 SF
Design
$10,000,000 CJ est. value
Ontario, NY 14519

3X Sheds
Post-Bid
West Point, NY

Last Updated 09/25/2020 09:45 AM
Project Title

Airfield Equipment Storage Building

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13212   (Onondaga County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced September 2020, Construction Completion Expected December 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of the construction of a 5,000 SF Storage Building at Syracuse Hancock International Airport, 189 Constellation Way North. Work includes the construction of a new 5,000 SF Building including site preparation, new electric service, building ventilation, solar panel component, and concrete flooring and sidewalk.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents