Similar Projects
Hudson Tunnel Project
Conception
$11,300,000,000 est. value
New York, NY

Spencer Lake Spillway Modification
Post-Bid
Owego, NY 13827

Mount Beacon Reservoir and Pocket Dam Rehabilitation
Renovation
Post-Bid
Beacon, NY

Village of Potsdam East Dam Hydro Rehabilitation
Term Contract
Results
Potsdam, NY 13676

Lake Casse, Upper Tea Kettle and Tea Kettle Dams Rehabilitation
Results
Mahopac, NY 10541

The Summit Center - Addition & Renovations
New Construction, Renovation, Addition - 16,500 SF
Construction
$2,000,000 to $2,300,000 est. value
Buffalo, NY 14228

Fallkill Dam Rehabilitation Project
Renovation
Post-Bid
$1,000,000 to $1,300,000 est. value
Poughkeepsie, NY 12601

Olympic Center Revitalization - Phase 1 Tunnel
Results
Lake Placid, NY 12946

Westside CSOAP Tunnel System Maplewood Siphon Improvements
Results
Rochester, NY 14614

May's Field Dam Removal
Results
Blooming Grove, NY 10914

Wilber Lake Dam Repairs and Improvements
Results
Oneonta, NY 13820

Newtown Hoffman Site 18 Remediation Dam Repairs
Results
Elmira, NY 14901

Washington Lake Dam Rehabilitation
Results
Less than $1,500,000 est. value
New Windsor, Newburgh, NY

Beaver Creek Clean River Project - Phase III - Beaver Creek Diversion Tunnel
Results
Albany, NY 12207

Beaver Creek Clean River Project - Phase IV - Third Avenue Tunnel
Results
Albany, NY 12207

Reported 06/18/2021 12:00 AM
Project Title

Lake Suzanne Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Spring Valley, NY   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this contract consists of removing and replacing the existing concrete spillway structure with a labyrinth spillway structure and raising the embankment elevations. After the existing concrete structure is removed and replaced, the embankment will be reshaped, and stabilized with Heavy Stone Fill, grass, and wild flowers. No utility work is anticipated.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents