Similar Projects
PT Lands Phase 3 Public Infrastructure
Infrastructure
Bidding
Bozeman, MT

2022 Baker Water Main Replacement
Infrastructure
Bidding
$200,000 est. value
Baker, MT

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Water System Improvements
Infrastructure
Results
Billings, MT 59105

2021 Hydrant Replacement Project
Infrastructure
Bidding
$680,000 est. value
Helena, MT

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Stoddard or Cooley Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59802

ADLC Daly Addition Road Improvements Project
Alteration
Post-Bid
Anaconda, MT

Beckwith Street Water Main Replacement
Infrastructure
Results
Missoula, MT 59801

Last Updated 04/15/2022 01:40 PM
Project Title

Spokane Avenue Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Whitefish, MT 59937   (Flathead County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 3,600 LF of 18" C900 PVC water main is to be installed under Spokane Avenue replacing existing water mains. The new main will tie-in to the existing water distribution system in several locations. Existing residential and commercial water services will be reconnected to the new water main. Sidewalks and curb will be removed and replaced at several intersections to meet current ADA requirements. Multiple fire hydrants will also be replaced. Horizontal directional drilling will be required for some water service connections. Services of a licensed arborist will be required to mitigate damage to existing trees along the project corridor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents