Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

NIC: Resurfacing Parking Lots
Infrastructure
Bidding
$870,000 CJ est. value
Coeur D Alene, ID 83814

NIC: Resurfacing Parking Lots
Infrastructure
Bidding
$870,000 CJ est. value
Coeur D Alene, ID 83814

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

Pavement Markings
Term Contract
Post-Bid
Hayden, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Steam Plant Elimination, Phase 1
Infrastructure
Bidding
$386,000 CJ est. value
Coeur D Alene, ID 83814

Supply and Apply Gravel Road Stabilization
Infrastructure
Post-Bid
Coeur d'Alene, ID

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

Tullamore Sports Complex, Phase I - Bid Package 1 - Roadway and Frontage Improvements
Infrastructure
Post-Bid
$123,000 CJ est. value
Post Falls, ID 83854

Mill and Plant Mix Inlay on SH-97 MP 86.9
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Asphalt and then a Plant Mix Overlay on SH-97
Infrastructure
Results
$500,000 to $1,000,000 est. value
ID

Moscow North and Moscow Alt Route
Infrastructure
Results

Kathleen Avenue Improvements
Infrastructure
Results
Coeur d'Alene, ID 83815

Last Updated 07/25/2022 11:35 AM
Project Title

New Football Field - Coeur d'Alene High School

Physical Address View project details and contacts
City, State (County) Coeur D Alene, ID 83815   (Kootenai County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,375,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project calls for the construction of a new artificial turf football field, with a new scoreboard/sound system and gated entrance. As of July 25, 2022, a designer and construction manager have been selected. Construction is anticipated to take place in the spring of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents