Similar Projects
Emergency Drought Improvements - Specialty Materials and Equipment
Infrastructure, Alteration
Bidding
Milan, MO

Earth City UPS Pump Station (P-702) Replacement Phase II
Infrastructure
Bidding
$1,147,000 est. value
Earth City, MO 63044

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Rehabilitate Relief Wells Phase 3
Infrastructure
Results
Kansas City, MO

Missouri Bluffs Park Well
Alteration
Results
Lake Saint Louis, MO 63367

Dewatering Pump Inspection & Repair - Rivers Project Office
Term Contract
Bidding
West Alton, MO 63386

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Lime Slurry Pumps
Infrastructure
Results
Festus, MO

Truman Lake Station Drainage Replacement
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Warsaw, MO 65355

Well Maintenance Contract Services
Term Contract, Infrastructure
Post-Bid
O Fallon, MO

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Neptune-Abaque Peristaltic Industrial Hose Pump Unit Model HDN25
Infrastructure
Post-Bid
Springfield, MO

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Replacing Ras Pumps, Control Panels, Check Valves, Piping and Motors
Alteration
Post-Bid
Fulton, MO

Last Updated 03/11/2022 10:58 AM
Project Title

Well Treatment and Pump Repair Project

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning & rehab of Wells 7 and 8 and pump repair at Well 8. Consists of furnishing all necessary labor, material, and equipment to clean and redevelop two vertical well screens and producing formations in the immediate vicinity of the screen. The work also includes removal and inspection of two vertical line shaft pumps, columns and motors and all incidental items necessary to complete the work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents