Similar Projects
North 28th Street and Ludwig Alley Drainage Project
Infrastructure
Bidding
Penbrook, PA 17109

North 28th Street and Ludwig Alley Drainage Project
Infrastructure
Bidding
Penbrook, PA 17109

Walnut Street Stormwater Improvement Project
Post-Bid
Millersburg, PA 17061

Parking Lot Pavement Restoration
Infrastructure
Post-Bid
Harrisburg, PA

Storm Drain Relocation at the High School
Results
Hummelstown, PA 17036

Administration Building Concrete Replacement
Results
$25,000 to $50,000 est. value
Middletown, PA 17057

Mini Basins BC-7A, Bc-7B, BC-7C, BC-7D, BC-8C and BC-8D Sewer Improvements Project
Infrastructure
Bidding
Harrisburg, PA

Parking Management and Basic Maintenance
Term Contract, Infrastructure
Post-Bid
Harrisburg, PA

Final Cover System Stormwater Management Devices Construction
Results
Hershey, PA 17033

Stormwater Control Measure Maintenance
Results
Harrisburg, PA 17106

2020 Sidewalk and Curb Improvement Project
Results
Halifax, PA 17032

Construction of the Polling Place ADA Improvements Project
Results
$550,000 to $600,000 est. value
Harrisburg, PA

Polling Place Ada Improvements - Alternate Sites
Results
$175,000 to $200,000 est. value
PA

Arsenal Boulevard Sewer Improvements - Phase 1
Results
$2,300,000 to $2,700,000 est. value
Harrisburg, PA 17103

North 6th Street Accessibility Route Phase 1
Results
Harrisburg, PA 17100

Last Updated 12/07/2021 08:58 AM
Project Title

Camp Curtin Big Green Block GSI and Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17110   (Dauphin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Project includes, but is not limited to, installation of right-of-way green stormwater infrastructure (GSI), including a subsurface detention system, sidewalk planter, tree pits, stormwater bumpout, and a green wall; drainage system improvements including replacement and installation of inlets and connected laterals; and installation of Americans with Disabilities Act (ADA) compliant curb ramps for pedestrian safety improvements. The work is geographically located at and around the Camp Curtin YMCA property at 2135 N. 6th Street, Harrisburg, PA 17110. The work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents