Similar Projects
Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Tiller Ranger Station HVAC Replacement & Heat Pump
Renovation
Sub-Bidding
$100,000 CJ est. value
Tiller, OR 97484

Boiler Maintenance and Repair
Renovation
Sub-Bidding
$500,000 CJ est. value
Portland, OR 97204

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

Eugene Mission HVAC Roof Top Unit Installation
Renovation
Sub-Bidding
$300,000 CJ est. value
Eugene, OR 97402

John Day HVAC Upgrades
Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Rufus, OR 97050

Rock Creek Campus Kennel AHU Replacement
New Construction
Results
Portland, OR 97229

Classroom Climate / Kenwood Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$197,862 CJ est. value
Bend, OR 97701

Replacement HVAC 7.5t Sector Columbia River
Renovation
Sub-Bidding
$400,000 CJ est. value
Warrenton, OR 97146

New-Hydronic Heating Condensing Boilers Inspection
Term Contract
Post-Bid
Roseburg, OR 97471

Last Updated 07/11/2023 10:47 AM
Project Title

Southridge High School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97008   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,594,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Scope of demolition and removal work is indicated on drawings. B. Scope of alterations work is indicated on drawings. C. HVAC: Replace HVAC control systems, rooftop air handling systems, pumps/motors, air distribution alterations, and other alterations as specified. D. Electrical Power: Provide motor VFDs, electrical distribution, and other alterations as indicated. E. Fire Alarm: Alter existing system and add new construction, keeping existing in operation. F. Architectural: Interior cutting and patching, ceiling removal and reinstallation, roof patching as indicated. G. Owner will remove the following items before start of work: 1. BSD will recover refrigerant from DX cooling systems indicated for demolition before start of work. The Beaverton School District will receive Bids for ITB 22-0032 for the provision of a General Contractor (GC) for the Southridge High School HVAC Upgrades. This Contract is for a Public Work subject to ORS 279C.800 to 279C.870. The District requires the project to be completed over the duration of the summer vacation beginning 6/12/2024.

Details

3 Stories Above Grade, 257,530 SF.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents