Similar Projects
Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

The Commons of Forsyth County Preschool
New Construction, Renovation
Design
Winston-Salem, NC 27101

Spencer Love Phase 2 Court Expansion Project
Bidding
Greensboro, NC 27455

North Waterfront Park Project
Post-Bid
Wilmington, NC

Hoover Road Athletic Park
Post-Bid
Less than $8,500,000 est. value
Durham, NC

Cape Fear River Trail Phase II - Part C
Results
Less than $2,424,242 est. value
Fayetteville, NC

Enloe High School Track Replacement
Results
Raleigh, NC 27610

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Construction of Shingle Landing Park
Construction
Less than $2,513,020 est. value
Moyock, NC

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Pleasant Park
Post-Bid
Less than $36,000,000 est. value
Apex, NC 27502

Running Track Resurfacing
Results
Less than $739,700 est. value
Cullowhee, NC

Athletic Improvements at West Brunswick High School
Construction
Shallotte, NC 28470

Albemarle Landing
New Construction
Design
$24,500,000 est. value
Charlotte, NC 28212

Last Updated 07/21/2021 11:45 AM
Project Title

Harding High School Track Improvements

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents