Similar Projects
McDonald Junior High School Addition
Addition
Conception
$20,876,963 est. value
Katy, TX 77449

High School 3 Construction
New Construction
Conception
Tomball, TX

Cy-Fair Multi Campus
New Construction
Design
Houston, TX

Art Consulting Mark Henry, Ed. D. Admin Building, and Visual and Performing Arts Center (VPAC)
New Construction, Term Contract
Bidding
Houston, TX

High School 12 project
New Construction - 499,295 SF
Post-Bid
Houston, TX 77000

High School Expansions Package 3
Renovation, Addition
Post-Bid
Less than $39,207,000 est. value
Channelview, TX 77530

Construction Services for Green Center Renovation
Renovation
Results
Less than $3,440,000 est. value
TX

Holbrook and Post Elementary School and Kahla Middle School Renovations
Renovation
Results
Less than $5,100,000 est. value
Houston, TX 77084

Construction Manager at Risk for System Upgrades and Renovations to Spring Woods High School
Renovation
Construction
Less than $25,000,000 est. value
Houston, TX

Construction Manager at Risk for Memorial High School Additions and Renovations
Renovation, Addition - 140,000 SF
Construction
$83,000,000 est. value
Houston, TX 77024

Awty Student Center Phase 2
New Construction
Pending Verification
$14,000,000 est. value
Houston, TX 77055

New Intermediate School
New Construction
Conception
Tomball, TX

New TEP Building and Central Office Renovation
New Construction, Renovation - 45,000 SF
Post-Bid
$11,000,000 est. value
Spring, TX 77379

Seabrook Intermediate Priority Repairs and Replacements
Results
Less than $3,517,000 est. value
Seabrook, TX 77586

Construction Manager at Risk for Northbrook High School Renovations and Additions
Renovation, Addition
Construction
$26,000,000 est. value
Houston, TX 77080

Reported 05/27/2022 12:00 AM
Project Title

Harmony School Of Fine Arts & Technology Exterior Wall Remediation

Physical Address View project details and contacts
City, State (County) Houston, TX 77054   (Harris County)
Category(s) Education, Single Trades
Sub-Category(s) Finishes/Interior, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work is to remediate from the foundation up 12 inches along the entire exterior perimeter of the building (approximately 926 linear feet). Stucco demolition and remedial damproofing shall occur in 50-foot sections. Each 50- foot section shall be demolished, weather barrier repaired, and base wall flashing shall be installed prior to moving to the next 50-foot section. Stucco shall be reinstalled with a weep screed one full wall width at a time. Refer to the attached drawings for proper remediation recommendations. For the identified curtainwall windows, 12 inches of stucco shall be removed at the jambs and head of each curtain wall section. Refer to the attached drawings for locations and remediation recommendations. Remove existing and install new urethane sealant between the existing paving and the building foundation. Install new ADA compliant threshold at Stair 119. Existing interior and exterior sheathing on exterior wall at Stair 11 shall be properly sealed, insulated, patched, repaired, and painted. Construction noise shall only occur before and after school is in session.

Details

Middle/Senior High School, Renovation.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents