Similar Projects
2023 Sidewalk Repair & Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Turtle Lake, ND 58575

DeTrobriand Bay Marina Marina Improvements - Phase 1
Infrastructure
Bidding
$1,945,105 CJ est. value
Garrison, ND 58540

2022 Exploratory Drilling AML
Term Contract, Infrastructure
Post-Bid

Gate Valve Replacement
Infrastructure
Post-Bid
$900,400 CJ est. value
Riverdale, ND 58565

McClusky Water Tower
Infrastructure
Results
$2,280,000 est. value
Turtle Lake, ND

Water Improvement District 2021-1 Pump House and Reservoir Improvements
Renovation, Alteration
Results
$475,000 est. value
Bismarck, Coleharbor, ND

Water System Improvements - Gate Valve Replacement - Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Riverdale, ND 58565

RFQ Construction Manager at Risk - Improvements - Renovations and/or Additions to Existing School Facilities
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Washburn, ND 58577

2022 Garrison Phase 5 AML
Infrastructure
Results
Garrison, ND

NAWS Intake and Snake Creek Pumping Plant Modifications Demolition (Contract 6-1A)
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Coleharbor, ND 58531

2022 Street and Utility Improvements
Infrastructure
Results
$1,905,462 CJ est. value
Wilton, ND 58579

Reclamation of the Wells - Package 1
Infrastructure
Post-Bid
$70,000 CJ est. value
Turtle Lake, ND 58575

Fort Stevenson State Park Master Lift Station Replacement
Renovation, Infrastructure
Results
$362,737 CJ est. value
Garrison, ND 58540

RFQ Construction Management - White Shield Son of Star Casino
New Construction, Infrastructure
Post-Bid
$18,000,000 CJ est. value
White Shield, ND 58540

Last Updated 01/20/2023 12:34 AM
Project Title

Northwest Area Water Supply (NAWS) Project

Physical Address View project details and contacts
City, State (County) Coleharbor, ND 58531   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

HEI-3553.0079/SCSI-205305320 In accordance with North Dakota Century Code Chapter 48, the project must be comprised of multiple bids. There are 4 contracts: Contract No. 1 - General Construction; Contract No. 2 - Mechanical Construction; and Contract No. 3 - Electrical Construction; which may be bid separately. A combined construction Contract, Contract No. 4 - Combined General, Mechanical, and Electrical Construction, which includes all Work, may also be bid. The contract(s) may be awarded to the lowest responsive and responsible bidder(s). The sum of Contracts 1, 2, and 3 will be compared to Contract 4 to determine the lowest bid. If Contracts 1, 2, and 3 are awarded, the General Construction Contractor will assume responsibility for coordinating the work of the prime contractors responsible for Contracts 2 and 3. The scope of Work for each Contract generally consists of the following: CONTRACT NO.1 - GENERAL CONSTRUCTION Construction work includes: Construction of new Northwest Area Water Supply (NAWS) raw water pumpstation inside the existing United States Bureau of Reclamation (USBR) Snake Creek Pumping Plant (SCPP) with Owner's pre-procured equipment, including 4 vertical turbine pumps, interior piping in sizes ranging from 1-inch to 54-inches located inside SCPP and 11' diameter SCPP discharge tunnel, valves, actuators, meters, supports, pump and surge control systems including two surge tanks, and other miscellaneous work. Work for the NAWS temporary intake includes installation of intake screens and attachment of intake bulkhead to SCPP. Work for the NAWS raw water pumpstation inside SCPP includes construction of new concrete floors, beams, and structural steel for installation of the NAWS raw water pumpstation. Work for the NAWS discharge pipeline includes installation of new piping and supports in the existing discharge tunnel. CONTRACT NO.2 - MECHANICAL CONSTRUCTION Construction work includes: Plumbing and HVAC work to modify the existing plumbing and HVAC in SCPP for the new NAWS raw water pumpstation. New HVAC system includes air handler unit, ductwork, and miscellaneous work. CONTRACT NO.3 - ELECTRICAL CONSTRUCTION Construction work includes: Installation of electric motors and variable frequency drives (VFDs) for new vertical turbine pumps, instrumentation, PLC/PC based control systems, control consoles, MCCs, starters, generator, transfer switch, transformer, general control electrical work, and other miscellaneous Work. CONTRACT NO.4 - COMBINED GENERAL, MECHANICAL, & ELECTRICAL CONSTRUCTION Construction work includes: All work associated with Contracts 1, 2, and 3 combined.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents