Similar Projects
Chiller/Cooling Tower Maintenance Services
Term Contract
Bidding
Williamsburg, VA

Air Handling Systems Replacement
Bidding
$100,000 to $199,999 est. value
Manassas, VA 20109

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
Norfolk, VA 23510

Server Room HVAC Replacement
Post-Bid
South Boston, VA 24592

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

Johnson-Williams Middle School Controls Replacement
Results
Berryville, VA 22611

HVAC Preventive Maintenance and On-Call Services
Term Contract
Bidding
Leesburg, VA 20176

HVAC Cleaning - 10 Locations at Defense Supply Center Richmond, VA
Post-Bid
Richmond, VA

HVAC Full Service Maintenance and On-call Repair Work facilities at the Virginia Military Institute
Term Contract
Results
Lexington, VA

HVAC Compressor Replacement Covington, VA (VA010)
Post-Bid
Covington, VA

Science Building Lab Exhaust Ductwork Repairs at Lord Fairfax Community College
Results
Middletown, VA

Maintenance and Repair Services on HVAC
Post-Bid
Arlington, Fort Belvoir, VA 22060

HVAC Improvement Main Terminal First Floor
Results
Richmond, VA 23250

W--Tent and A/C Unit Rental
Post-Bid
Fort Myer, VA 22211

Heat Pump System - Germanna Community College
Results
Culpeper, VA 22701

Reported 02/17/2021 12:00 AM
Project Title

LINAC AHU Construction

Physical Address View project details and contacts
City, State (County) Newport News, VA   (Newport News City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $400,000 to $1,500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes modifications to the cooling systems in the North and South LINAC buildings. These building contain power supplies and electronic racks which produce significant heat. Also, consists of installation of two new air handling units and ductwork modifications in the North and South LINAC buildings. New controls will need to be provided for the new AHU's along with associated electrical work. New units will be chilled water units. - Demolition of three existing air handlers inside the building is also part of project along with unit’s chilled water piping. - Controls will also include installation of temperature probes to monitor rack temperatures as well as return air temperature.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 27 - Communications, Data Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents