Similar Projects
Last Updated | 10/27/2021 06:48 AM |
Project Title | Guardrail, Cable Guiderail and Attenuator Repair |
Physical Address | View project details and contacts |
City, State (County) | NC (Cleveland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 Sp Emergency Call Back Mobilization 5 Ea 2 Sp Temporary Single Lane Closure - Multi-Lane Divided Facility (Engineers Discretion) 40 Ea 3 Sp Steel Beam Guardrail Repair 2,500 Lf 4 Sp Steel Beam Guardrail Repair (Rail Only) 250 Lf 5 Sp Steel Beam Guardrail Repair, Double Faced 250 Lf 6 862 Steel Beam Guardrail Terminal Section 3 Ea 7 Sp Triple Corrugated Sb Guardrail Repair (Thrie Beam) 100 Lf 8 Sp 20" Tubular Triple Corrugated Sb Guardrail Repair 200 Lf 9 Sp Guardrail Anchor Unit - Type Iii 4 Ea 10 Sp Guardrail Anchor Unit - Type Iii Modified 4 Ea 11 Sp Guardrail Anchor Unit - Type b-83 1 Ea 12 Sp Guardrail Anchor Unit - Type b-77 4 Ea 13 862 Guardrail End Unit – Type Cat-1 5 Ea 14 862 Guardrail End Unit - Type At-1 2 Ea 15 Sp Buffer End Section Cat-1 (Replacement Part) 5 Ea 16 Sp Buffer End Section At-1 (Replacement Part) 2 Ea 17 862 Steel Beam Guardrail (New Installation) 500 Lf 18 Sp Guardrail End Unit - Type Tl-3 15 Ea 19 Sp Guardrail End Unit - Type Median Tl-3 10 Ea 20 Sp Head (Replacement Part – Type Tl-3 And Tl-3 Median) 5 Ea 21 Sp Anchor Rail (Replacement Part–Type Tl-3 & Tl-3 Median) 25 Lf 22 Sp Steel Hinged Post (Replacement Part-Type Tl-3 & Tl-3 Median) 2 Ea 23 Sp 6’ Steel Breakaway Post (Weakened) (Replacement Parttype Tl-3 & Tl-3 Median) 5 Ea 24 Sp Additional Guardrail Post (Steel) 25 Ea 25 Sp Additional Guardrail Post (Wood) 50 Ea 26 Sp Additional Guardrail Weak Post 10 Ea 27 Sp Additional Block (Wood Or Plastic) 50 Ea 28 Sp Steel Beam Guardrail Transition Section - Dbl Face Weak To Dbl Face Normal 5 Ea 29 Sp Guardrail Wtr Steel Transition Section 4 Ea 30 862 Triple Corrugated Sb Guardrail Terminal Sections 2 Ea 31 Sp Typical End Shoe 4 Ea 32 863 Remove Existing Guardrail 250 Lf 33 Sp Impact Attenuator Unit, Type Tl-3 - 90"(Non-Gating) 2 Ea 34 Sp Impact Attenuator Unit, Type Tl-3 -24" (Non-Gating) 2 Ea 35 Sp Remove & Stockpile Existing Guardrail 250 Lf 36 864 Remove And Reset Existing Steel Beam Guardrail 250 Lf 37 Sp Remove And Reset Existing Guardrail End Unit 2 Ea 38 Sp Additional Guardrail Delineator 250 Ea 39 Sp Cable Guiderail Repair 2,000 Lf 40 Sp Cable Guiderail Splice 5 Ea 41 Sp Cable-Rail (Cable Wire) 250 Lf 42 Sp Cable Guiderail Retensioning (Each Cable) 10 Ea 43 864 Remove And Reset Existing Cable Guiderail 250 Lf 44 Sp Additional Cable Guiderail Delineator 100 Ea 45 Sp Cable Guiderail Anchor Post 20 Ea 46 Sp Cable Guiderail Spring Cable End Assembly 3 Ea 47 Sp Additional Cable Guiderail Intermediate Post 5 Ea 48 Sp Cable Guiderail Anchor Unit 1 Ea 49 Sp Cable Guiderail Breakaway Anchor Angle 2 Ea 50 Sp Cable Guiderail Turnbuckle Assembly 5 Ea 51 Sp Additional Cable Guiderail Hook Bolt 5 Ea 52 Sp Additional Cable Guiderail End Post Cap 5 Ea 53 Sp Cable Guiderail End Post Bearing Plate 5 Ea 54 Sp Concrete Median Barrier Repair (Less Than 1 Cy) 3 Cy 55 Sp Concrete Median Barrier Repair (1 To 3 Cy ) 3 Cy 56 Sp Concrete Median Barrier Repair (More Than 3 Cy) 3 Cy 57 Sp After-Hours Mobilization For Concrete Barrier Wall Repair 3 Ea 58 Sp Temporary Double Lane Closure For Median Barrier Repair 3 Ea |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |