Similar Projects
Replace Chemical Storage Tanks
Term Contract, Alteration
Bidding
$36,400 est. value
FL

New Self Service AVGAS System
Infrastructure
Bidding
Punta Gorda, FL

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Industrial Water Treatment Facility (IWTF) Tank Replacement
Post-Bid
Saint Petersburg, FL 33716

Jet A 15,000 Gallon Bottom Load Fuel Tank System
Results
Lake City, FL

Fuel Tank Repair at Brooksville Operations Center
Results
Brooksville, FL 34604

Orange County Convention Center Campus Diesel Tanks Replacement
Infrastructure
Bidding
$1,750,000 est. value
Orlando, FL 32819

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Results
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

3,000 Gallon Capacity Aboveground Diesel Storage Tank
Alteration
Bidding
$65,000 est. value
Apollo Beach, FL 33572

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Fuel Dispensers Replacement
Results
Tallahassee, FL 32300

Oil and Gas Waste Stations
Infrastructure
Bidding
Less than $500,000 CJ est. value
Key West, FL

Stainless Steel Fuel Storage Tanks, Purchase and Delivery
Post-Bid
Palm Beach, FL

Ramrod Pump Station Diesel Fuel Tank Aluminum Access Platform
Results
Key West, FL 33040

Last Updated 11/05/2021 09:46 AM
Project Title

Fuelmaster Upgrades and New Site Installs

Physical Address View project details and contacts
City, State (County) Tamarac, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrading and expanding use of Syntech Systems Fuel Management solutions. The project shall be broken out into two (2) phases (Phase 1 and Phase 2) described herein, and the City reserves the right to contract for one or both phases dependent upon the cost/budget.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents