Similar Projects
2021 Annual Pavement/Utility Contract
Term Contract
Post-Bid
Greenville, TX

Water/Sewer Connections
Term Contract
Post-Bid
Greenville, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Collection System Improvements
Results
$2,700,000 to $2,950,000 est. value
Wolfe City, TX

Construction Manager-at-Risk for The Lake Ralph Hall Raw Water Pipeline Project
Infrastructure
Post-Bid
$115,000,000 est. value

Verandah Phase 4 Water, Sanitary Sewer and Storm Drainage Improvements
Results
Greenville, TX

Utility Improvements to Serve Trailstone Phase 4
Infrastructure
Post-Bid
Caddo Mills, TX 75135

TWDB DWSRF Distribution System Improvements - Waterline
Results
$1,200,000 est. value
Wolfe City, TX

Utility Improvements to Serve Magnolia, Phase 10
Infrastructure
Post-Bid
Royse City, TX 75189

FM 2642 Waterline Project
Results
Less than $200,000 est. value
TX

Waterline Construction
Infrastructure
Post-Bid
Greenville, TX

Waterline Construction
Results
Greenville, TX

Verandah Phase 3A Water, Sanitary Sewer, and Storm Drainage Improvements
Infrastructure
Post-Bid
Greenville, TX

Fate Transmission Line Phase 2
Results
Less than $2,000,000 est. value
Greenville, TX

Verandah Phase 9 Water, Sanitary Sewer, and Storm Drainage Improvements
Infrastructure
Post-Bid
Greenville, TX

Last Updated 05/05/2022 07:03 AM
Project Title

Stuart/Anderson Waterline Repair

Physical Address View project details and contacts
City, State (County) Greenville, TX 75401   (Hunt County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Design and install a chlorination system to meet increased feed rate requirements based on site visits and customer provided data. Based on 50PSI inlet and 20 PSI back pressure, the system we are proposing will operate two (2) 2” injectors and chlorinators to feed 2,300 PPD. 2. Installation of temporary system during install as needed. Removal of existing injectors pipe valves and fittings. Installation of above equipment, all SCH80 PVC pipe, valves, and fittings with bypass around booster pumps. New PVC gas line to existing 4 (1) ton cylinders and 4 proposed new 1-ton cylinders through trench to gas line manifold. New gas line in chlorinator room to all new proposed feeders, injectors (new and existing) along with the V10K’s that are replacing the two feeders to tank one and two. Booster pump installation drawing (for electrical install) upon request after receipt of PO.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents