Similar Projects
Urban Wilderness - Fort Dickerson Quarry Phase II - City of Knoxville
New Construction
Conception
$3,000,000 est. value
Knoxville, TN 37920

Washington Pike Improvements - City of Knoxville
Alteration
Conception
$15,860,000 est. value
Knoxville, TN 37917

Coward Mill Widening - Knox County
Infrastructure
Design
$3,100,000 est. value
Knoxville, TN 37931

Kingston Pike Village - Phase 2
New Construction, Infrastructure
Design
$89,000,000 CJ est. value
Farragut, TN 37934

Haslam Field Expansion - Bid Package #1: Site Grading and Utilities
Renovation
Post-Bid
Knoxville, TN 37916

Playground Pour in Place Surfacing
Renovation
Post-Bid
Knoxville, TN 37909

On-Call Road Maintenance
Infrastructure
Results
Farragut, TN

Waterfront Drive Roadway Improvements Phase II- Rough Grading
Infrastructure
Results
Knoxville, TN

Lone Tree Pass
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Knoxville, TN 37902

Lone Tree Pass
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Knoxville, TN 37902

First Baptist Concord Church Educational Building
Addition, Demolition, Infrastructure - 27,900 SF
Pending Verification
$8,000,000 CJ est. value
Farragut, TN 37934

The Villages of Farragut Phase 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Farragut, TN 37934

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

The Rowan Apartments
New Construction, Infrastructure
Design
$64,000,000 CJ est. value
Knoxville, TN 37923

Fraternity Park Basketball Courts Resurfacing
Renovation, Term Contract
Post-Bid
Knoxville, TN 37916

Last Updated 03/31/2023 11:22 AM
Project Title

Anderson Training Center - Tennessee Athletics

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37916   (Knox County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 31, 2023, this project was approved and moving forward. Further details regarding design and construction have not been identified. A firm timeline for construction has not been confirmed. The closed solicitation has been included below for reference. This project will expand the facility by 36,000 square-feet and renovate nearly 100,000 square-feet of existing space with a focus on the student-athlete experience.

Details

100,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents