Similar Projects
Fire Protection Panels Alarm and Monitoring Systems Preventative Maintenance and Repair Services
Results
Jacksonville, FL 32221

Maintenance and Inspection Services for Fire Extinguishers, Fire Suppression Systems and Emergency Light
Term Contract
Results

Kennedy Generating Station Fire Protection Loop Replacement
Results
Less than $750,000 est. value
Jacksonville, FL 32206

AASF #1 Cecil Field AFFF Fire Suppression System Conversion Hangar 860
Post-Bid
Jacksonville, FL 32221

69--Surface Fire Fighting Trainer Smoke/Fog Generation System
Post-Bid
Mayport, FL - Newport, RI - Norfolk, VA

Main Library Parking Garage Sprinkler System Repair
Results
Less than $172,388 est. value
Jacksonville, FL 32202

Design Build Services for Fire Stations 36, 64 and 65
Results
Jacksonville, FL

Z--DDJF Fire Protection Phase 2, Naval Air Station, FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Jacksonville, FL 32212

Fire Alarm System Replacement - Emmett Reed Community Center
Results
Less than $22,144 est. value
Jacksonville, FL

Z--DDJF Fire Protection Phase II, Naval Air Station, Florida
Post-Bid
$10,000,000 est. value
Jacksonville, FL 32212

Electric Plant Fire Protection System Inspection, Testing, and Maintenance Services
Results
Jacksonville, FL

Market Survey: The FAA is Seeking Interested Sources that are Capable of Design and Construction to Replace the Fire Detection and Annunciation Systems at Numerous Facilities Throughout the United States
Results
$3,000,000 to $5,000,000 est. value

City Hall Fire Alarm System Replacement
Results
Less than $179,000 est. value
Jacksonville, FL

Fire Alarm System Replacement - Agriculture Cooperative Extension
Results
Less than $17,823 est. value
Jacksonville, FL

DLA Fire Protection MATOC
Post-Bid
$100,000 to $125,000,000 est. value

Last Updated 10/30/2019 03:18 PM
Project Title

Fire Systems Testing

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32218   (Duval County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project also involves the inspection and testing of the Base Fire Suppression Systems to include the following systems. Wet (to include Hydrants, Water Tanks and Fire Protection Backflows), Dry sprinkler systems, Pre-action sprinkler systems, Dry chemical systems, Fire pump inspections, High Expansion Foam (HEF) Systems and Hood Systems.
Details
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents