Similar Projects
GTIB Project - Bonneyman Road and Riverwoods Drive
Infrastructure
Bidding
Blackshear, GA

CDBG-Sandy Bottom Neighbohood
Infrastructure
Bidding
$830,000 est. value
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Blackshear 2021 LMIG
Infrastructure
Post-Bid
$250,000 est. value
Blackshear, GA

Southern Region Disaster Recovery Support BPA
Results

Resurfacing FY 2020
Results
Blackshear, GA 31516

Street Drainage and Improvements
Infrastructure
Bidding
Blackshear, GA 31516

TIA Band 1 - Tammie Street, Shana Lane, and Moody Lane
Infrastructure
Post-Bid
$150,000 est. value
Blackshear, GA 31516

10.769 Miles of Milling, Resurfacing and Shoulder Rehabilitation at Various Locations
Results
GA

6.012 Miles of Widening, Resurfacing and Shoulder Rehabilitation on St Johns Church Rd (CR 349) Beginning at SR 121 and Extending US 84
Results
GA

TIA Band 1 Street Improvements
Results
Less than $1,000,000 est. value
Blackshear, GA 31516

Resurfacing, Rumble Strips, Sign Improvements
Results
Less than $50,000 est. value
GA

Polyethylene, Polymer and Metal Pipe
Term Contract
Results
Blackshear, GA

Installation of Box Culverts
Results
Less than $392,253 est. value
Blackshear, GA 31516

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Reported 07/01/2021 12:00 AM
Project Title

Road and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Blackshear, GA 31516   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of road and drainage improvements to Cardinal Drive and Bluebird Drive as well as road improvements to Redstone Circle and Mulligan Circle in Blackshear, Georgia. The road improvements include full depth reclamation, crack treatment, grading, paving, striping, and signage. The drainage improvements include installing storm pipes, drop inlets, and associated grading.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents