Similar Projects
Coddle Creek Tributary Outfall Near Concord Parkway South - City of Concord
Infrastructure
Conception
$4,746,000 est. value
Concord, NC 28025

Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

FY23 ADA Improvements
Infrastructure
Design
$267,991 CJ est. value
Harrisburg, NC 28075

R. Brown McAllister STEM Elementary **Balance of Work Package**
New Construction, Infrastructure - 116,000 SF
Sub-Bidding
$37,000,000 CJ est. value
Concord, NC 28025

Lower Rocky River Pump Station Expansion
Post-Bid
Concord, NC 28025

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Coddle Creek Raw Water Main Supply Improvements
Results
$4,300,000 est. value
Concord, NC 28027

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Davidson Highway Ranch Homes
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Concord, NC 28027

Highway 73 Industrial
New Construction, Infrastructure - 419,000 SF
Pending Verification
$225,000,000 CJ est. value
Concord, NC 28027

Miami Church Road 12"/24" Parallel Water Line Extension - US Highway 601 To Cold Springs Road - City Of Concord
Infrastructure
Conception
$7,718,000 est. value
Concord, NC 28025

Substation T
Infrastructure
Post-Bid
Concord, NC

Kannapolis Crossing Contract 1 Water Line
Results
Kannapolis, NC

Last Updated 08/26/2022 05:04 AM
Project Title

Kensington Pump station Decommissioning (1500 LF Of 8-Inch gravity line) (CPF) - Town Of Harrisburg

Physical Address View project details and contacts
City, State (County) Harrisburg, NC 28075   (Cabarrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Kensington Pump station Decommissioning (1500 LF Of 8-Inch gravity line) (CPF) As of August 26, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents