Similar Projects
Hedgesville High School SBA Needs Improvement Project
Alteration
Conception
$5,952,000 est. value
Hedgesville, WV 25427

Arts & Cultural Facility Renovation
Renovation, Alteration
Design
Weston, WV

Roof Replacement for the Scott High School Fieldhouse
Alteration
Bidding
$686,000 est. value
Madison, WV 25130

Grafton High School Roof Replacement
Alteration
Bidding
$1,500,000 est. value
Grafton, WV 26354

Claymont Mansion Roofing Repairs
Post-Bid
Charles Town, WV 25414

West Virginia School of Osteopathic Medicine Main Building Roof Replacement
Post-Bid
Lewisburg, WV 24901

Carter Hall and Van Meter Roof Replacement
Results
Morgantown, WV 26506

Chelyan Salt Building Roof Exit 85
Results
Charleston, WV 25306

Westside HVAC and Roof Project
Alteration
Bidding
$4,000,000 est. value
Pineville, WV

Historic Building Roof Removal & Replacement
Renovation
Post-Bid
Harpers Ferry, WV 25425

MET Theatre Roof Repair
Results
Less than $277,165 est. value
Morgantown, WV 26505

Roof Replacement at the ADA Wastewater Treatment Plant Garage
Post-Bid
Bluefield, WV

Hawks Nest State Park CCC Restrooms and Gift Shop Roof Rehabilitation
Results
Ansted, WV 25812

Roof for Cabwaylingo Trailhead and Maintenance Building
Post-Bid
Man, WV 25635

Roof Replacement - Western Regional Juvenile Center
Results
Barboursville, WV

Last Updated 06/27/2022 10:42 AM
Project Title

Roof Replacement on Morgan County Courthouse/E911 Annex

Physical Address View project details and contacts
City, State (County) Berkeley Springs, WV   (Morgan County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing roofing material down to the original decking on entire roofing substrate. All material removed from property must be properly and legally disposed of in land fill. 2. Install new insulation/under lay system to meet required County building code. The new insulation materials shall be fully adhered to the existing deck as per manufacturer and industry specifications. 3. Install new decking material if needed to support roofing system. 4. Provide proposals for adhered EPDM Roof System 5. All new roofing products shall be installed per manufacturers recommendations and their published installation manuals. 6. Provide and install all new roofing components including and specifically limited to all, flashings where needed. All materials not seen from the ground will be manufactured from 24 gauge galvanized. 7. Provide a minimum 15-year warranty for all roofing products cover materials with no depreciation and a 5-year workmanship warranty for all related work as well. Provide 15-year manufacturer's warranty as well as a 2-year workmanship warranty for weather tightness of the project. 7Provide a minimum 15-year warranty for all roofing products cover materials with no depreciation and a 5-year workmanship warranty for all related work as well. Provide 15-year manufacturer's warranty as well as a 2-year workmanship warranty for weather tightness of the project.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents