Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Gladys Drive and Vicinity Main Replacement
Infrastructure
Bidding
$5,150,000 est. value
Pleasant Hill, CA

Pure Water Program (PWP) Morena Conveyance South & Middle and Morena Conveyance Bike Lanes
Infrastructure
Bidding
$116,300,000 est. value
San Diego, CA 92101

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Replace Waste Lines
Alteration
Design
$1,000,000 to $5,000,000 est. value
San Diego, CA

Earl Schmidt Filtration Plant (ESFP) Washwater Return and Sludge Systems
Term Contract, Alteration
Bidding
Santa Clarita, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Cold Water Meters
Term Contract
Bidding
Sacramento, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Last Updated 02/23/2022 06:13 AM
Project Title

2022 Bijou 2/3 Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) South Lake Tahoe, CA   (El Dorado County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,165,707
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of the installation of approximately 4,500 linear feet of 8-inch C900 water main and associated water services, fire hydrants, mainline connections and site restoration including landscaping, paving and other related work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents