Similar Projects
SR 42 at S Fork Peachtree Creek of Decatur
Infrastructure
Design
$5,000,000 est. value
Atlanta, GA 30329

2021 Splost Resurfacing Project
Infrastructure
Bidding
$400,000 est. value
Stone Mountain, GA

2022 Street Resurfacing Phase 2
Infrastructure
Bidding
$2,000,000 est. value
Tucker, GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Public Work Services
Post-Bid
Brookhaven, GA

I-285 / I-20 East Interchange Project
Results
$534,000,000 est. value
GA

I-285 PIB Interchange Improvements
Results
GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Sexton Drive Road Repair Project
Results
Stone Mountain, GA 30083

Roadway, Sidewalk, Right of Way Maintenance and Repair Services
Infrastructure
Post-Bid
Sandy Springs, GA

Road Improvement Program Hugh Howell Rd At Flintstone Dr
Results
Less than $855,262 est. value
Tucker, GA 30084

T32-D7-PCC Repair-District Wide-130159
Infrastructure
Post-Bid

LMIG Street Resurfacing
Results
College Park, GA 30337

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

New Peachtree Road LCI
Results
Doraville, GA 30341

Reported 06/24/2022 10:42 AM
Project Title

SR 10 From SR 8 to Gwinnett County Line

Physical Address View project details and contacts
City, State (County) Stone Mountain, GA 30086   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Stone Mountain, Georgia. Working plans call for site work for a road / highway; and for paving for a road / highway. This project, selected by the District Maintenance Office, is the resurfacing of SR 10 to improve the roadways current low PACES rating. County: DeKalb As of June 23, 2022, the project is in Final Planning status. Anticipated letting Month is June, 2022. GADOT - SR 10 From SR 8 to Gwinnett County Line *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents