Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

I-75 MLK DDI
Post-Bid
FL

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

FY19 CDBG Area Proposed Sidewalk Improvements Design-Build
Results
Less than $735,407 est. value
Temple Terrace, FL 33617

Sidewalks Near Mort Elementary - Various Locations (LAP)
Results
Less than $573,976 est. value
Tampa, FL 33613

The Sanctuary at James H Shimberg Estates Parking Lot Resurfacing
Infrastructure
Post-Bid
Tampa, FL 33604

Sidewalk Construction - Gibsonton Elementary (LAP)
Results
Less than $346,198 est. value
Gibsonton, FL 33534

Continuing Contract for Miscellaneous Concrete Flat Work
Term Contract
Post-Bid
Temple Terrace, FL

Sidewalk Construction - Lutz Lake Fern Road Trail (LAP)
Results
Less than $94,668 est. value
Tampa, FL 33600

Midtown District Development
Results
Plant City, FL

Flexible Paving/Cement Concrete Pavement/Widening of Existing Entrance and Exit Ramps at I-75 SB Rest Area
Results
Less than $13,085,100 est. value
FL

Boardwalk Repair and Maintenance
Results
Less than $450,000 est. value

Mirabay Pavement Rehabilitation Project
Results
Apollo Beach, FL 33572

46th Street from SR 580 (Busch Boulevard) to SR 582 (Fowler Avenue) Bike Lane/Sidewalk
Results
$1,773,533 est. value
Tampa, FL 33602

East Columbus Drive from North Nebraska Avenue (SR45) to 14th Street Bike Lane/Sidewalk FDOT LAP
Results
$2,011,394 est. value
Tampa, FL 33602

Last Updated 08/30/2021 05:21 AM
Project Title

Pedestrian Mobility and Safety Improvements

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,786,203
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to perform work under this contract to include, but not be limited to, sidewalk, and curb and gutter improvements; clearing and grubbing; earthwork; sodding; milling and resurfacing; signalization; pavement markings, and signing. utility coordination incidental to the construction; incidental coordination with municipalities in Hillsborough County including coordination and compliance of inter-local agreements; incidental coordination of work within railroad rights-of-way with CSX; restoration and cleanup of the construction sites.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents