Similar Projects
Pavement Reconstruction, Resurfacing, Curb and Gutter
Infrastructure
Bidding
Highland, IL

Antioch Road District Materials Supply
Post-Bid
Antioch, IL 60002

2021 Patrol 1 Maintenance
Post-Bid
Libertyville, IL

Sealcoating
Renovation
Results
Island Lake, Wauconda, IL 60084

Buffalo Creek Trail Extension From Lake Cook Road to the Existing Trail
Results
Arlington Heights, IL 60004

Washington Street Resurfacing
Renovation
Post-Bid
IL

(3.10 Mile) Overlay, Pedestrian Ramp New Hma Shoulders On Il- 173 Shoulders On Il- 173 From Green Bay Rd To Sheridan Rd . Drainage Improvement Between Hebron Ave. And Galilee Ave. In The City Of Zion.
Results
Zion, IL

Class B Patching, Class D Patching, Crack Filling of a Concrete Roadway, Striping Replacement, Curb and GutterRemoval and Replacement
Post-Bid
IL 60089

Milling and Resurfacing of Grass Lake Road, Main Street, and Millburn Road
Results
Libertyville, IL 60048

Il Route 43 At Westleigh Road Intersection
Term Contract
Post-Bid
Lake Forest, IL 60045

Storm Sewer Removal and Installation, Storm Sewer Installation By Directional Boring, Culvert Removal, Patching, Placement of HMA Surface Course, Earthwork, Dewatering, and Other Related Items
Results
Libertyville, IL 60048

Central HS Parking Lot Improvements North HS Courtyard Improvements
Post-Bid
Grayslake, IL 60030

RR-18-4382 - Stearns School Road Bridge Reconstruction
Renovation
Results
Less than $10,000,000 est. value
Old Mill Creek, IL 60083

2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

Laneville Drive Roadwork
Results
Ingleside, IL 60041

Last Updated 10/06/2021 01:56 PM
Project Title

Asphalt Pavement and Concrete Sidewalk Repairs

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will encompass approximately 20,500 square feet of mill and overlay and approximately 5,500 square feet of sidewalk replacement. District 128 is also accepting sealed bids for Parking Lot Repaving at Vernon Hills High School utilizing new asphalt pavement over existing and new base aggregate. Concrete curb and concrete sidewalk repairs will be performed at various locations. See plans for full scope of work. The project will encompass approximately 160,000 square feet of parking lot and drive repaving plus concrete repair work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents