Similar Projects
Reported | 05/11/2022 12:00 AM |
Project Title | Roof Repairs, Fall Protection, Building Envelope On-Call Portwide 2022 |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA (King County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes but is not limited to installation and repair of engineered fall protection systems, building envelope related systems, and may include replacement or repair of roofs & canopies. Systems: Single Ply Membrane, PVC Membrane Roofing, Hypalon Roofing Membrane, EPDM (Ethylene Propylene Diene Monomer) Roof Membrane, TPO (Thermoplastic Polyolefin) Single-ply Roofing. Personal fall arrest protection: installation and repair of arrest protection systems consisting of anchorage, connectors, cable systems, and body harness, and may include a deceleration device, lifeline, or suitable combinations. Coatings: Fibered emulsion coatings, Fibered asphalt coatings, Reflective aluminum coatings, Reflective elastomeric coatings. Standing seam metal roofs. Siding: wood and/or metal siding systems and building wrap systems. Sealants & Waterproofing: Associated with general building envelope restoration and/or sealing & waterproofing fall protection anchorage points. Painting: Paint coatings associated with restoration of original or better conditions in association with building envelope work or fall protection installation or repair. The work may include but is not limited to: Removal, control and disposal of asbestos (e.g., asbestos roofing, mastics and sealants). Control and disposal of lead waste resulting from impact to lead containing paint, removal of lead-containing materials (e.g., roof vents), and removal of items coated with lead-containing paint. Control of fugitive dust and silica resulting from demolition work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |