Similar Projects
Last Updated | 06/02/2021 03:29 PM |
Project Title | 2021 Water Main & Service Line Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Highland Park, MI (Wayne County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace approximately 39,100 linear feet of existing cast-iron water main with new C900 pipe with diameter sizes of 8 inch, 12-inch, 16-inch, and 24-inch and replace roughly 390 service lines, consisting of public- and private-side water service line replacements. Replacement will include meter hookup, flushing, and testing, following regulatory guidelines for lead line replacements as necessary. The project is located in following six phases throughout the City. Contractors may bid on one or any combination of these phases. Phase 1 Hamilton – (including tie-ins/stub outs) Woodward – (Includes stubs to outside MDOT ROW) Phase 2 – E/W Streets (Hamilton stub to Woodward) Phase 3 Glendale Phase 4 Lodge Service Phase 5 – E/W Streets (Lodge to Hamilton stub) Phase 6 – 3 New Valves on the mains to the Plant Phase 6A – Middle Route Phase 6B – South Route Phase 6C – North Route |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |