Last Updated 06/02/2021 03:29 PM
Project Title

2021 Water Main & Service Line Replacement Project

Physical Address View project details and contacts
City, State (County) Highland Park, MI   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace approximately 39,100 linear feet of existing cast-iron water main with new C900 pipe with diameter sizes of 8 inch, 12-inch, 16-inch, and 24-inch and replace roughly 390 service lines, consisting of public- and private-side water service line replacements. Replacement will include meter hookup, flushing, and testing, following regulatory guidelines for lead line replacements as necessary. The project is located in following six phases throughout the City. Contractors may bid on one or any combination of these phases. Phase 1 Hamilton – (including tie-ins/stub outs) Woodward – (Includes stubs to outside MDOT ROW) Phase 2 – E/W Streets (Hamilton stub to Woodward) Phase 3 Glendale Phase 4 Lodge Service Phase 5 – E/W Streets (Lodge to Hamilton stub) Phase 6 – 3 New Valves on the mains to the Plant Phase 6A – Middle Route Phase 6B – South Route Phase 6C – North Route

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents