Similar Projects
Z2DZ--Replace HVAC B404 (C) 676-16-102
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Beyer Home Chimney Replacement
Bidding
Oconto, WI

UW Platteville HVAC System Renovation And Skylight Replacement
Renovation
Bidding
Platteville, WI 53818

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

Heating Distribution Upgrades - MEP
Bidding
$2,870,000 est. value
Madison, WI 53705

Boiler Replacement
Post-Bid
Milwaukee, WI 53207

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

Heating Distribution Upgrades - General
Bidding
$2,870,000 est. value
Madison, WI 53705

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Replacement of Furnaces
Results
$25,000 to $100,000 est. value
Fountain City, WI 54629

HVAC Replacement
Bidding
WI

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Last Updated 03/03/2021 01:53 AM
Project Title

Water Filtration Plant Boiler and Controls Replacement and Wastewater Treatment Plant HVAC Replacement

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54901   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/09/21
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace one (1) indoor air handling unit and one (1) roof-mounted air-cooled condensing unit and provide and install one (1) indoor air handling replacement unit and one (1) roof-mounted replacement air-cooled condensing unit, including temperature controls; Remove five (5) existing rooftop makeup air units and provide and install five (5) replacement rooftop makeup air units, including temperature controls; and Disconnect existing temperature controls from equipment scheduled to be replaced and reconnect temperature controls to new equipment. Remove nine (9) existing hot water control valve actuators and provide and install nine (9) replacement hot water valve actuators; Test and document performance of two (2) hot water valve actuators; Remove two (2) existing chilled water pumps and provide and install two (2) replacement chilled water system pumps; Provide and install two (2) variable frequency drives to serve new chilled water pumps; Remove two (2) existing hot water heating system pumps and provide and install two (2) replacement hot water heating system pumps; Remove three (3) existing hot water heating boilers and provide and install three (3) replacement hot water heating boilers; and Remove existing temperature control system and replace with new web-based, non-proprietary DDC system (includes all existing HVAC equipment and replaced HVAC equipment within the Water Filtration Plant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.