Similar Projects
Last Updated | 01/25/2021 07:39 AM |
Project Title | Expression of Interest to Design and Engineer Halon Fire Suppression Systems with FK-5-1-12 Clean Agent Fire Suppression Systems at the Savannah River Site- Located near Aiken, SC |
Physical Address | View project details and contacts |
City, State (County) | Aiken, SC (Aiken County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Summary: Establish a Blanket Order Agreement (BOA) under which Task Orders will be issued to define, request and authorize specific tasks. Provide engineering and design services required for the replacement of existing Halon 1301 Fire Suppression Systems with FK-5-1-12 Clean Agent Fire Suppression System(s) in designated Liquid Waste Organization (LWO) buildings / facilities at the Savannah River Site (SRS). This Statement of Work (SOW) will establish a Blanket Order Agreement (BOA) under which Task Orders will be issued to define, request and authorize specific tasks. The fire suppression system replacement in each building or facility will be a separate Task Order. Required Codes / Standards National Fire Protection Association (NFPA) NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, 2018 Edition Underwriters Laboratories Inc. (UL) ANSI/UL 2166, Standard for Halocarbon Clean Agent Extinguishing System Units, 2012 Drawing/Sketches shall be supplied for a designated facility with each Task Order to enable Supplier/Subcontractor design. General LWO currently has seven (7) buildings / facilities with Halon fire suppression systems. These Halon systems are to be replaced with FK-5-1-12 systems. The scope covered under this subcontract shall be released incrementally by LWO Task Orders that are individually negotiated and include task specific technical and quality program requirements. The Subcontractor shall provide an FK-5-1-12 fire suppression system engineering and design package for a specific or designated building / facility at SRS that is identified in a detailed Task Order executed under the BOA. Each FK-5-1-12 fire suppression system shall be designed in accordance with NFPA 2001 requirements and shall be listed by Underwriters Laboratories Inc. or approved by FM Global. The technical and quality requirements provide a range of specific tasks expected to be executed. Each Task Order will clearly define all specific aspects of the task including, as appropriate: Engineering requirements Performance requirements Quality requirements Applicable codes & standards Schedule Deliverables Acceptance Method |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |