Similar Projects
(167.4-Mile) Utter/ Debris Removal from Edge of Pavement
Infrastructure
Bidding
IL

(292.2-Mile) Litter/ Debris Removal from Edge
Infrastructure
Bidding
IL

Snow and Ice Removal
Post-Bid
Buffalo Grove, IL 60089

Curbside Residential Solid Waste and Recycling Services
Term Contract
Post-Bid
Bloomingdale, IL 60108

2020 Pond Sediment Removal
Results
Des Plaines, IL 60016

Improvement Consists of Litter/Debris Removal from the Edge of the Pavement to the Pedestrian Barrier on I-55 Expwy from I-355 to Reed Rd
Results
IL

Hauling of Sewer Debris (Special Waste), Catch Basin Debris
Infrastructure
Bidding
Chicago, IL

Removal of Certain Vegetation, Waste Hauling, Filling, Grading and Mulching of Bare Earth
Post-Bid
Foosland, IL 61845

Sludge Hauling and Disposal - Rantoul Wastewater Treatment Plant
Results
Rantoul, IL 61866

Tree Removal
Infrastructure
Bidding
Decatur, IL

Snow and Ice Removal Services for Five Sections
Post-Bid
Glenview, IL

CPS SCI Chemical Package – Group 6
Alteration
Results
Chicago, IL

Snow Removal
Infrastructure
Bidding
Rock Island, IL

Waste and Recycling Services
Post-Bid
Lincolnshire, IL 60069

Cleanup of Demolition Debris and Grading
Demolition, Infrastructure, Alteration
Results
Quincy, IL 62301

Reported 11/01/2021 12:00 AM
Project Title

Snow Removal

Physical Address View project details and contacts
City, State (County) Carthage, IL   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents