Similar Projects
Last Updated | 11/21/2022 12:10 PM |
Project Title | Ravine Stabilization and Stormwater Management Project |
Physical Address | View project details and contacts |
City, State (County) | Pickerington, OH 43147 (Fairfield County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $119,509 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All labor, material and services necessary for the Ravine Stabilization and Stormwater Management project, all in accordance with items 1 and 2 of the drainage site report prepared by Thomas H, Marshall, PHD., P.E. Engineering, Operations and Construction Management. Direct all questions to Thomas H. Marshall, (614) 778-7877, contactus@marshallengineeringandconstruction.com . Each bid must include a Bid Guaranty as described in the Instructions to Bidders; Ohio prevailing wage rates are required. No bid may be withdrawn within 60 days after the bid opening. The Library reserves the right to waive irregularities, reject any or all bids, and to investigate bidder responsibility. Completion Date: 120 Calendar Days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |