Similar Projects
Wasson Way Uptown Connector Trail - State of Ohio
Infrastructure
Conception
$250,000 est. value
Cincinnati, OH 45207

The RED - Commercial Building
New Construction, Infrastructure - 50,000 SF
Design
$15,000,000 CJ est. value
Cincinnati, OH 45227

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

Streetscape at College Hill Station
New Construction, Demolition, Infrastructure
Post-Bid
Cincinnati, OH 45245

Streetscape at College Hill Station
New Construction, Demolition, Infrastructure
Post-Bid
Cincinnati, OH 45245

Major Reconstruction - HAM-74 - 18.01
Results
Cincinnati, OH 45203

Addyston Park Road and Walking Path Asphalt Project
Results
Addyston, OH 45001

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

Logan Street Mixed Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$5,000,000 CJ est. value
Cincinnati, OH 45202

Logan Street Mixed Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$5,000,000 CJ est. value
Cincinnati, OH 45202

Wyler Colerain Honda Vehicle Storage Lot
Infrastructure
Design
$100,000 CJ est. value
Cincinnati, OH 45251

Redevelopment of 31 Garfield Place
Infrastructure
Post-Bid
Cincinnati, OH 45202

Broadway Street Stabilization
Results
$383,921 est. value
Loveland, OH 45140

Public Infrastructure Improvements for Three Oaks - Package 2B Infrastructure Construction
Infrastructure
Construction
Cincinnati, OH 45209

Last Updated 10/11/2022 06:04 AM
Project Title

Sidewalk - FY 23

Physical Address View project details and contacts
City, State (County) Lockland, OH 45215   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $588,979 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The repair of sidewalk and ADA ramps in sections along Wyoming Ave and Mill St. Install flashing beacons, and restripe pedestrian crossing at Anna St and Wyoming Ave.Install audible pedestrian signals at existing crossing signals at Wayne Ave and Wyoming OHDOT - Sidewalk - FY 23 Date Set for Completion: 8/1/2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents