Canon Community Ditch Association - Phase II Acequia Improvements Project
New Construction
Results
$250,000 est. value
Canones, NM

Lincoln National Forest Gravel Pits
Term Contract
Results
Sacramento, NM 88347

Primrose School of Northwest Albuquerque
New Construction
Design
Albuquerque, NM 87120

Excavation and Dirt Work
Infrastructure
Results
NM

San Pedro Mine Safeguard Project - Phase III
Results
Santa Fe, NM 87505

Hydro Excavation, Multi-Term Contract
Term Contract, Infrastructure
Results
Farmington, NM

Underground Concrete Utility Vaults
Results
Less than $50,000 est. value
Farmington, NM

UNM Construction Manager At Risk - UNM Valencia Campus Work Force Training Center
Results
Less than $5,435,505 est. value
Albuquerque, NM

Last Updated 01/04/2022 05:14 PM
Project Title

Hydro Excavation, Multi-Term Contract

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes but is not limited to: 1.2. Expose existing underground utilities by potholing and slot trenching for installation and verification purposes. 1.3. Excavation for pilot holes, pole holes, anchor holes, pilings, footings and shoring. 1.4. Debris removal from building interiors and exteriors, culverts and storm water systems. 1.5. Bidder shall be responsible for clean-up and removal of all debris at the time of service for each excavation project, with no additional cost to the City. 1.6. Excavation shall be done in a way that eliminates disturbance to nearby property. 1.7. Clean-up of overspray and excess debris shall be done immediately 1.8. Remove/dispose of excavated materials and water as well as compacted backfill 1.9. Bidder shall not perform any work on an overtime basis unless such overtime work has been authorized in writing by the department of the City requesting the service. 1.10. Overtime rate will be applied to time worked in excess of normal eight (8) hour days Monday through Friday. If any other rates are applicable, Bidder shall list them on a separate sheet and attach it to their bid response.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents