Similar Projects
Sunview/Telfair Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,745,000 est. value
Charlotte, NC

Severn (Sunnyvale) Storm Drainage Improvement Project - City Of Charlotte
Infrastructure
Conception
Less than $9,250,000 est. value
Charlotte, NC 28202

Manhole Replacement on 1500 Block of West Warren Street
Alteration
Design
$2,000,000 est. value
Shelby, NC 28150

2018 Storm Drainage Improvements - Contract No 1
Infrastructure
Bidding
$590,647 est. value
Seaboard, NC

Underground Utility Repair
Term Contract
Bidding
NC

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

Peeler Community Park Site Improvements and Renovations
Renovation
Post-Bid
Greensboro, NC 27405

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

On-Call Stormwater Control Measure Repair Services
Results

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

Waterstone Medical Office Building Site Package
New Construction
Construction
Hillsborough, NC 27278

Magnolia/Winthrop Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,500,000 est. value
Charlotte, NC 28203

Installation of Regenerative Stormwater Conveyance
Infrastructure
Bidding
$700,000 est. value
Lenoir, NC 28645

East River - Phase 3, 4, and 5
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Smithfield, NC

Storm Water Repair and Improvement FY2021-E
Results
$4,147,144 est. value
Charlotte, NC

Last Updated 07/14/2022 09:06 AM
Project Title

Inflow & Infiltration (I&I) FY25-26 - SR-II-25 - City of Jacksonville

Physical Address View project details and contacts
City, State (County) Jacksonville, NC   (Onslow County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $585,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will represent the City's ongoing effort to reduce infiltration of groundwater and inflow of stormwater into the sewer collection system which usually is attributable to aging infrastructure that needs maintenance or replacement. Reduction of I&I translates to reduced operational and maintenance costs as well as reducing the risk of sewer system overflows (SSOs) during periods of high rainfall. The first phase of this work will involve identifying sources of I&I by one or more of the following: flow monitoring, smoke testing, and video inspection. These sources will be prioritized based upon severity and location along with other sources discovered via other utility projects and through the work of the City's Utilities Maintenance Division. Once I&I sources are identified and prioritized, a project will be undertaken to correct as many of the deficiencies as the available budget will allow. It is expected that the project will involve several repair and rehabilitation methods including but not necessarily limited to, complete manhole-to-manhole line replacements, spot repairs, manhole repairs and Cured-In-Place Pipe Lining (CIPPL). This project is in included in the City of Jacksonville FY 2023-2032 Capital Improvement Plan (CIP). As of July 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents