Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

CTE Center - Phase 1 (Ag Science Center to House Animals)
New Construction
Conception
$8,205,000 est. value
College Station, TX

Blinn College Rellis Student Building - Phase 2
New Construction - 80,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Bryan, TX 77807

Satellite Utility Plant (SUP3) Expansion
Addition
Design
$20,930,520 est. value
College Station, TX 77840

Uvalde Campus Modular Building Site Prep
New Construction
Bidding
Uvalde, TX 78801

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

Kingwood Campus - Health Professions Center
New Construction - 49,000 SF
Post-Bid
Kingwood, TX 77339

CMAR UHD Student Wellness and Success Center
Results
Houston, TX 77204

CMAR - New Recreation Center
New Construction - 23,760 SF
Results
$13,800,000 est. value
College Station, TX 77840

CMAR PVAMU Engineering Classroom Research Bldg
New Construction - 101,987 SF
Construction
Less than $552,499,000 est. value
College Station, TX 77840

Dallas Baptist University Student Housing Phase III
New Construction - 10,500 SF
Construction
$2,200,000 est. value
Dallas, TX 75211

BCM Education Space
Renovation
Pending Verification
Houston, TX 77030

Cherry Engineering Building Renovation
Renovation
Pending Verification
$2,500,000 est. value
Beaumont, TX 77705

Trinity University Campus
New Construction, Renovation, Addition
Conception
$50,000,000 est. value
San Antonio, TX 78212

Active Learning Center Construction
New Construction - 80,000 SF
Design
$60,000,000 est. value
Huntsville, TX 77340

Reported 04/21/2022 08:53 AM
Project Title

Idea Palmview Phase II

Physical Address View project details and contacts
City, State (County) Mission, TX 78572   (Hidalgo County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects include construction of a new 2-story addition that will be attached to the end of the existing Phase I building. It will consist of a steel frame with metal stud commercial construction, brick and EIFS to match existing. The additions are approximately 28,166 sq. ft. The projects will also include sitework, landscape, and interior finishes.

Details

College/University, 2 Stories Above Grade, 28,166 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents