Similar Projects
Last Updated | 01/17/2023 06:11 AM |
Project Title | RFP Engineering - Lake Park Multi-Use Path Engineering |
Physical Address | View project details and contacts |
City, State (County) | Hope Mills, NC 28348 (Cumberland County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town of Hope Mills is soliciting proposals for the services of a firm/team for the following contract scope of work: to provide preliminary engineering services (PE) for the construction of a concrete eight-foot-wide multi-use path along the eastern side of N. Main St. (NC-59), in front of the Hope Mills Lake Park in Hope Mills, NC. The path stretches from Lakeview Dr. to the entrance of the Lake Park concession stand. The Town of Hope Mills is soliciting proposals for the services of a firm/team for the following contract scope of work: to provide preliminary engineering services (PE) for the construction of an eight-foot-wide multi-use path along the eastern side of N. Main St. (NC-59), in front of the Hope Mills Lake Park in Hope Mills, NC, stretching from Lake View Dr. to the entrance of the Lake Park concession stand. The project will require the installation of approximately 815 feet of concrete pathway. At this time there is no anticipated right-of-way acquisition that will need to occur in association with this project. The Town anticipates the need to change utilities elevations (i.e., manholes, handholes etc.) and the re-grading of land to ensure adequate drainage, and ADA compliance. The project also requires the demolition, and removal of the existing 8-foot asphalt pathway. The construction of the multi-use path may also require the installation of at least two crosswalks and associated signage. PROPOSED CONTRACT TIME: 6 months + extensions pending authorization by the Town. PROPOSED CONTRACT PAYMENT TYPE: Lump sum; Invoiced every 30 days. Question Deadline 01/13/2023 All submissions, correspondence, and questions concerning this RFLOI should be directed to Stephen Kessinger at sdkessinger@townofhopemills.com. The last addendum will be issued no later than January 16, 2023. The Department encourages the use of Small Professional Services Firms (SPSF). Small businesses determined to be eligible for participation in the SPSF program are those meeting size standards defined by Small Business Administration (SBA) regulations, 13 CFR Part 121 in Sector 54 under the North American Industrial Classification System (NAICS). The SPSF program is a race, ethnicity, and gender-neutral program designed to increase the availability of contracting opportunities for small businesses on federal, state or locally funded contracts. SPSF participation is not contingent upon the funding source. The method of contractor selection has not been determined at this time. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |