Similar Projects
Manitowish - Hurley Const / Resurface
Infrastructure
Conception
$750,000 CJ est. value
Manitowish Waters, WI 54545

Saint Germain - Sayner
Infrastructure
Conception
$3,000,000 CJ est. value
Saint Germain, WI 54558

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

New Chippewa Housing Authority Offices Building
New Construction
Post-Bid
$173,000 est. value
Lac du Flambeau, WI

Forest Edge Apartments - LDF
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lac du Flambeau, WI 54538

Grind and Repave Camp Road
Infrastructure
Results
$60,878 CJ est. value
Eagle River, WI 54521

2023 CTH M Roadwork Marsh Lane to Center St.
Infrastructure
Results
$103,855 CJ est. value
Eagle River, WI 54521

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

2022 Road Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Boulder Junction, WI 54512

Lac Du Flambeau Band Of Lake Superior Chippewa Indians Request For Proposals For Resurfacing Of Multiple Driveways
Infrastructure
Post-Bid
$300,000 CJ est. value
Lac du Flambeau, WI 54538

Lakeview Circle Project
Infrastructure
Post-Bid
$110,000 CJ est. value
Phelps, WI 54554

RFP D/B - Tribal Broadband Connectivity Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Lac du Flambeau, WI 54538

Lac du Flambeau Chippewa Housing Authority LIHTC II
New Construction, Infrastructure
Post-Bid
$10,185,106 CJ est. value
Lac du Flambeau, WI 54538

Construction of a New Fire Station #1
New Construction, Infrastructure - 18,500 SF
Post-Bid
$100,000 CJ est. value
Lac du Flambeau, WI 54538

Town Park Pavilion Concrete Replacement
Infrastructure
Post-Bid
$40,000 CJ est. value
Winchester, WI 54557

Last Updated 09/08/2023 09:03 AM
Project Title

Lac du Flambeau Chippewa Housing Authority LIHTC I

Physical Address View project details and contacts
City, State (County) Lac du Flambeau, WI 54538   (Vilas County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $9,482,484 [brand] Estimate
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

LDF CHA LIHTC I project for rehabilitation of 24 single-family homes which includes Fifteen ranch homes and nine split levels. These existing three bedroom homes will have a bedroom and bath addition to be updated to four bedroom homes. Two of the Homes will be modified to be accessible and five ad-ditional homes will be universal per WHEDA standards, totaling 27,458 rehabilitated and 5,982 new construction.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents