Similar Projects
Last Updated | 03/12/2023 11:31 AM |
Project Title | New Haven Subdivision Stormwater Improvements |
Physical Address | View project details and contacts |
City, State (County) | Perry, GA 31069 (Houston County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $41,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Grading, site improvements, irrigation piping removal, erosion and sedimentation control, and all related work necessary for stormwater swale improvements. The time allotted for final completion of work is 30 consecutive calendar days. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Following the closing time for the receipt of bids no bid may be withdrawn for a period of sixty (60) days.The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Grading, site improvements, irrigation piping removal, erosion and sedimentation control, and all related work necessary for stormwater swale improvements. The time allotted for final completion of work is 30 consecutive calendar days. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |