Similar Projects
Purchase and Installation of Aluminum Piers
Results
Lawrenceville, GA 30045

Shamrock CUB Deck Replacement
Infrastructure
Results
Jonesboro, GA 30236

Dock Refurbishments at the East River Terminal
Results
Brunswick, GA 31520

Sapelo Island-Meridian Dock Replacement
Infrastructure
Results
Darien, GA 31305

Design-Build Etowah River Park Canoe Launch
Infrastructure
Results
Dawsonville, GA 30534

Berth 1 Fender Replacement
Infrastructure
Results
$750,000 to $1,500,000 est. value
Brunswick, GA 31523

Field Decking Installation for Special Events
Infrastructure
Results
Statesboro, GA 30458

Dry Docking and Repair of the Research Vessel Savannah 2021
Results
Athens, GA

Floating Dock and Gangway Replacement for Lower Lock and Dam Park
Infrastructure
Results
Rome, GA 30161

Providence Park Improvements
New Construction - 635 SF
Results
$206,731 est. value
Milton, GA 30009

Tilden Norris Marshwalk Repairs
Infrastructure
Results
Saint Marys, GA 31558

Waterfront Repairs
Term Contract, Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Bainbridge, GA

Riverside Parkway At Sweetwater Creek Bridge Rehabilitation
Results
Douglasville, GA

Blythe Island Regional Park Fishing Pier Repair and Boat Launch Pier Rehabilitation - FY22
Infrastructure
Results
Brunswick, GA 31523

Last Updated 05/31/2022 10:54 PM
Project Title

Mayor's Point Terminal - Fender Replacement project

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31520   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Proposed project consists of providing all materials, equipment, and labor required to replace the existing fender system at the Mayor’s Point Terminal Berth. Specifically, the project consists of all work required to remove existing rubber arch fenders, steel fender piles and timber chocks and install new rubber fender leg elements, steel fender piles with a UHMW facing, and timber chocks.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents