Similar Projects
Roadway Minor Rehab
Infrastructure
Conception
$2,392,066 CJ est. value
Chillicothe, OH 45601

Roadway Minor Rehab
Infrastructure
Conception
$2,392,066 CJ est. value
Chillicothe, OH 45601

SR 138 - Culvert Preservation
Infrastructure
Design
$300,000 CJ est. value
Clarksburg, OH 43115

SR 138 - Culvert Preservation
Infrastructure
Design
$300,000 CJ est. value
Clarksburg, OH 43115

Box Culverts
Infrastructure
Post-Bid

Concrete Pipes
Infrastructure
Post-Bid

Slide Repair - ROS-SR 41-05.50 Geotech
Infrastructure
Results
OH

Two Lane Resurfacing - ROS-US 50-00.00 PV
Infrastructure
Results
OH

Geologic Maintenance / Slide Repair
Infrastructure
Conception
$1,197,635 CJ est. value
Springfield Township, OH 45601

Wastewater Treatment Plant Renovations - City of Chillicothe
Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Chillicothe, OH 45601

Precast Catch Basins, Risers, and Grates
Infrastructure
Post-Bid

Slide Repair - SR 772-10.30 OH18-01
Infrastructure
Results
Ross County, OH

Repave Roads
Term Contract, Infrastructure
Post-Bid
Chillicothe, OH 45601

Culvert Replacement - SR 207-09.32 Culvert
Infrastructure
Results
$353,412 est. value
OH

Concrete Pipes
Infrastructure
Post-Bid

Last Updated 05/03/2023 08:34 AM
Project Title

Culvert Replacement

Physical Address View project details and contacts
City, State (County) Chillicothe, OH 45601   (Ross County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $226,791 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract ID: ROS111274 Culvert Replacement - culvert and/or headwall replacement(s) on forest rd 10 from s.l.m. 0.00 to s.l.m. 1.99 & forest rd 16 from s.l.m. 0.00 to s.l.m. 1.30. Each bidder is required to file with his bid a certified check or cashiers check for an amount equal to five percent (5%) of its bid, but in no event more than fifty thousand dollars, or a bid bond for ten percent (10%) of its bid payable to the "Director of Transportation". The successful bidder must furnish a performance bond and a payment bond in an amount equal to one hundred percent (100%) of the awarded contract amount. EDGE Goal: 5.0% OH DOT - Culvert Replacement Date Set for Completion: 8/31/2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents