Similar Projects
Reported | 05/30/2020 12:00 AM |
Project Title | 6140--Battery Bank Replacement |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33125 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All hardware should be installed in such a manner to minimize damage and maximize patient and employee safety. All equipment and procedures shall conform to OSHA, NEMA, and ANSI Standards as well as conform to the Standard Building Code/Standard Mechanical Code. 3.2. Glossary. Acronyms used in this PWS are listed below for easy reference: CO Contacting Officer COR Contracting Officers Representative FAR Federal Acquisition Regulation 4.0. Performance Requirements. Contractor shall provide and replace 8D AGM Batteries. The Contractor will come in and remove temporary batteries from the Paralleling gear. Contractor will then install the 8D AGM Batteries in the 3rd floor Utility plant. Contractor will wire all batteries in series. Contractor will have to install or build a rack for the batteries to sit in. Contractor will also be installing a Battery Charger (A77D/DE Series Battery Charger P/N A77DE-25-130V-A1-60L DC Amps Output: 25 DC Volts Output: 130 AC Volts Input: 120Vac, 1-phase Battery Cell Range/Type: 60 cells, AGM). The Charger will also be located on the South side of the Paralleling gear. Contractor will also be installing 8 B6A12B (P/N A12B-20-24V-A1-12LDC Amps Output: 20 DC Volts Output:24 AC Volts Input: 120Vac, 1-phase battery Cell Range/Type: 12 cells, AGM) series filtered battery charger for the batteries. The charger will be near the batteries so it could be monitor and PM at the same time as the batteries. The contractor will also be installing batteries on our six Generators on the 4th floor they will also be installing battery chargers for the Generators. The Contractor will include all relevant documents, manuals and service warranties for the Bruce W. Carter Miami Veterans Affairs Medical Center (BWCMVAMC) Battery System on the 3rd floor of the Utility Plant. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |