Similar Projects
Last Updated | 02/22/2023 09:40 AM |
Project Title | Water Treatment Plant High Service Pump Station HVAC Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Billings, MT 59101 (Yellowstone County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $575,821 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 31, 2023, this project has not yet been awarded. The project is expected to be awarded on February 13, 2023. The Project generally consists of: Installation of two (2) new Roof Top Units (RTUs) to upgrade the HVAC system of the High Service Pump Station at the City of Billings Water Treatment Plant. This includes additional ductwork in the facility and electrical connections to the existing system; demolition of existing membrane roofing; structural upgrades to the building roof, including new membrane roofing, insulation, and drains; and exterior roof access staircase and/or ladder modifications. For further information concerning this project, please contact David Carlson, PE with AE2S at 2624 Minnesota Avenue, Billings, MT 59101, by telephone at 406-702-7716 or 406-403-8721 or by email at David.Carlson@AE2S.com; or contact Will Robbins at the Office of the City Engineer, 2224 Montana Avenue, Billings, MT 59101, by telephone at 406-657-8237, or by email at robbinsw@billingsmt.gov. OWNER'S RIGHTS RESERVED: The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid that is in the best interest of the Owner. The City of Billings is an Equal Opportunity Employer. i. Construction start = Not before September 15, 2023. ii. Substantial completion = By November 1, 2023. iii. Final completion = 30 Days after substantial completion. This is generally described as the Installation of Owner Procured 55 Ton Roof Top Unit (RTU) and generally consists of: o Structural upgrades to the building roof. o Electrical connections to the existing system. o Ductwork in the facility. o New exterior ladder and demolition of existing. o Unloading and placement of the 50 Ton RTU at a location directed by the City on the WTP Site. o Assigned Owner Responsibilities associated with Assigned Contract No. 1, excluding payment responsibilities. Elements of the Work associated with the roofing membrane consisting of: o Demolition of the existing insulation and membrane roofing. o Installation of roof drain modifications. o Installation of new membrane insulation roofing. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |