Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Rehabilitate Runway 18-36
Infrastructure
Bidding
$2,342,026 CJ est. value
Rantoul, IL 61866

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation
Bidding
Mount Carroll, IL 61053

Install 8' Class E Fence and Gates, Phase 4
Infrastructure
Sub-Bidding
$657,573 CJ est. value
Cairo, IL 62914

Paint Pavement Marking
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Coatsburg, IL 62325

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation - 49,875 SF
Post-Bid
Mount Carroll, IL 61053

4th Street Reconstruction, Drainage and Water System Improvements
Infrastructure
Results
$709,800 CJ est. value
Milledgeville, IL 61051

Demolish And Construct Buildings And Additions (General - Construction)
New Construction, Addition, Infrastructure - 6,100 SF
Results
Less than $1,500,000 est. value
Cairo, Harrisburg, Murphysboro, Pinckneyville, IL

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Interchange Reconstruction: I-57
Demolition, New Construction, Infrastructure
Construction
$125,999,995 CJ est. value
Champaign, IL 61822

Contractors Shop
New Construction - 6,750 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Champaign, IL

Last Updated 03/31/2023 11:05 AM
Project Title

Addition to Tuscola Maintenance Building - Contract No. 1 - Complete Construction Work

Physical Address View project details and contacts
City, State (County) Tuscola, IL 61953   (Douglas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 31, 2023, bids were rejected. No definite date for the rebid. 40'x100' Addition to existing pole barn building. Addition to consist of concrete drilled piers, grade beam, sloped 6" concrete slab w/ trench drains. Pole barn building w/ pre-engineered wood trusses; 2x wall girts and purlins & metal siding and roofing panels to match existing. A three lane shooting range is included in the scope and consists of 8" concrete walls, steel frame & metal decking supporting concrete ceiling. Addition to: Tuscola Maintenance Building 00030 - 1 UAA No. 22009 CONTRACTS Bids will be taken and Contracts awarded as follows: CONTRACT NO. 1 - Complete Construction Work. BID SECURITY A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the bid shall be submitted with each bid as guarantee that the bid will not be withdrawn within thirty (30) days after the date of opening of bids, and that the successful bidder will enter into a Contract for the work awarded him. The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond for the full amount of the bid accepted. PREVAILING WAGE RATES Contractors and Subcontractors shall be required to comply with the Prevailing Wage Rates as determined by the Illinois Department of Labor and adopted by the County. SALES TAXES This project is exempt from sales tax. The Owner will provide the Contractor with tax exempt identification number upon request. PROPOSAL REJECTION AND IRREGULARITIES The right is reserved by the Owner to reject any or all bids or waive any informality in any bid and to accept any bid considered advantageous to the Owner.

Details

4,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents