Similar Projects
Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

2022 Pavement Maintenance
Infrastructure
Post-Bid
$270,000 est. value
Sheridan, WY

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Guardrail and Miscellaneous Work
Infrastructure
Results
WY

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Pending Verification
$25,400,000 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Pending Verification
$25,400,000 CJ est. value
Sheridan, WY 82801

The Powder Horn Pro Shop
New Construction, Infrastructure - 2,000 SF
Conception
$500,000 CJ est. value
Sheridan, WY 82801

Replace Building 9 Stairs and ADA Ramp
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Sheridan, WY 82801

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Results
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

Dayton Waste Water Treatment Plant Improvements - Phase II
Renovation, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Dayton, WY 82836

Chip Sealing and Miscellaneous Work
Infrastructure
Results

Reported 12/17/2022 12:00 AM
Project Title

Wolf Creek Road Reconstruction Project

Physical Address View project details and contacts
City, State (County) Ranchester, WY 82839   (Sheridan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Wolf Creek Road Reconstruction Project - Update The Project includes removing the existing roadway surface and placing approximately 2,900 SY of asphalt surfacing, removal and replacement of reno mattresses, installation of Flexamat Plus, and installing and repairing various sizes of CMP Culverts. Questions regarding this project will be received until 10:00 am local time on December 9, 2022. Questions should be addressed to WWC Engineering, Attn: Leland Fabel at (307) 672-0761 or lfabel@wwcengineering.com.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents