Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Timeless Timber Site Residential Redevelopment
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Ashland, WI 54806

Pond and Drainage System Construction
Infrastructure
Bidding
$270,923 CJ est. value
De Pere, WI 54115

Pond and Drainage System Construction
Infrastructure
Bidding
$270,923 CJ est. value
De Pere, WI 54115

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Village Center 2nd Addition Utility and Roadway
Infrastructure
Results
Howard, WI

2021 Waste Water Treatment Plant Mixer Install
Renovation
Results
Ashland, WI 54806

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Last Updated 04/24/2023 01:04 AM
Project Title

Main Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Neshkoro, WI 54960   (Marquette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $498,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 02/08/2023 All bids were rejected. Est. Completion Date: Feb. 2, 2024 All bids rejected Description: The work for this project will be performed at the site of the existing Village of Neshkoro Main Sewage Lift Station. This Contract shall include all labor and equipment including general, mechanical, electrical, and instrumentation work. The Contractor shall be responsible for constructing, modifying, and maintaining in service the sewage system associated with the replacement of the Main Sewage Lift Station at all times unless specifically indicated otherwise. The Owner's operating personnel will be responsible for operating existing and new facilities in accordance with the construction sequence and schedule. At no time shall the Contractor's personnel, equipment, or material prevent the access by Owner's staff to any item of equipment, piping, wiring, or controls. The Contractor shall notify the Engineer one week in advance of the time that is necessary to take out of service an existing sewage lift station, piping, or electrical circuit, or to bypass any portion of the sewage lift stations, force mains, or sanitary sewers. Bypassing of untreated or partially treated wastewaters to surface waters, storm sewers, or drainage courses will not be permitted during construction. The Contractor shall forward flow to the WWTP located just southeast of the station. The existing Main Sewage Lift Station was constructed in 1973. The Main Sewage Lift Station is located approximately 350 feet north of the intersection of S State Street and E Wall Street, near a gravel lot on a Village owned parcel off of S State Street. Access to the site is from public right of way. Additional Description: Replace the Main Sewage Lift Station Pump Controls & SCADA Engine Generator & Transfer Switch

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents