Similar Projects
Reported | 04/04/2021 11:10 AM |
Project Title | PreQualifications for Crescent Hill Discharge System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY (Jefferson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications, Bidding Expected third quarter 2021, Construction Start Expected fourth quarter 2022, Construction Completion Expected fourth quarter 2026 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | -Systematically Demolish and Remove existing 48” and 60” cast iron and 78” steel discharge headers. Includes various sizes of connecting piping and valve types from 20” to 60” diameter. -Systematically Furnish and Install two 78” steel discharge headers. Includes various sizes of connecting piping and valve types (e.g. butterfly, gate, ball) from 20” to 78” diameter. -Rehabilitate (carbon fiber-reinforced polymer liner) short sections of 60” cast iron and 78” steel water mains. -Abandon/Remove short sections of large diameter yard piping. -Furnish and Install 60” diameter steel yard piping. -Furnish and Install all appurtenances including fittings, valves, Venturi meters, valve actuators, supports, air valves, surge valves, and associated work. -Furnish and Install interior building modifications and replacements including pipe supports, stairs, handrails, floor slabs, grating, and coatings. -Includes lead based paint abatement on piping and architectural/structural surfaces. -Furnish and Install Electrical and Controls, including valve actuators, lighting, and minor upgrades to small Control Room. In order to bid on this project, firms must be pre-qualified in Heavy Construction Plant Work or 16” – 60” Steel Water Mains. All subcontractors performing Electrical / Controls work must be pre-qualified in Electrical Category. All subcontractors performing Interior Water Pipe Linings (field applied) must be pre-qualified in 24” – 60” Pipeline Carbon Fiber Wrap Lining. All subcontractors performing Coatings (Field applied) must be pre-qualified in Painting or Water Tank Coating. Please review the Prequalification application on Louisville Water website by clicking the link. https://louisvillewater.com/procurement/contractor-prequalification |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |